My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SBLM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
SBLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 4:41:30 PM
Creation date
11/10/2010 4:41:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED 20. EXAMPLE PROJECT KEY NUMBER <br /> 6 <br />TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, if not specified. <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Miami-Dade Correctional Facility, Miami, FL <br /> PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Ongoing Ongoing <br /> <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami General Services Administration Ace Marrero, Design & Construction (305) 375-1115 <br /> Division Manager <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) <br /> <br /> <br />INMATE <br />RESIDENT <br />~t'~:3:~:~~] <br /> <br />INMATE <br />RESIDENT <br />ie:1;"iN <br /> <br />INMATE <br />RESIDENT <br />:;~>.i~~i] <br /> <br />INMATE <br />RESIDENT <br />~i,,:!<1 <br /> <br />SBLM is working with the Miami-Dade County <br />General Services Administration Design & <br />Construction Services Division on the re- <br />design and rehabilitation of this two-story <br />correctional facility, originally constructed in <br />the 1980s and now maintained by Miami-Dade <br />County. Consisting of first and second floor <br />administrative and support areas, mechanical <br />spaces on the third floor and two floors of <br />patient cells, the volume is separated into two <br />towers and connected by a central vertical <br />circulation core. <br /> <br />SHADED AREA INDICATES <br />SIGHTLlNE INTO CELL <br /> <br />r <br /> <br />DAY <br />BOOM <br />~~ <br /> <br />SBLM conducted sightline studies to meet <br />the County's goals of maximizing visibility <br />into the cells. Other improvements included <br />replacement of shower doors, introducing <br />one treatment room into each individual cell <br />pod, paint and finish upgrades, and general <br />refurbishment of MEP systems. All renovations <br />will bring the facility up to ADA compliance, per <br />the County's mandate. <br /> <br />TREATMENT \ <br />ROOM ' <br />~ <br /> <br />INMATE <br />RlSIDlN I <br /> <br />Lti_~~~~ <br /> <br />The project team was led by James Cohen <br />AlA, LEED AP with Project Manager Glenn <br />Lurie AlA, LEED AP. <br /> <br />SIGHTLlNE STUDY - NEW GLASS <br />WALL & DOOR AT EXISTING WALLS. <br /> <br />II <br />1 <br />I <br /> <br />INMAll <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (1) FIRM LOCATION (City and State) (1) ROLE <br />a. SBLM Architects PC Miami, FL Architect <br /> <br />I r lY 'f~r J r)('+ 1 ()CJI,J ...;[ F:l~(lriil( 11\ ;~\! <br /> <br />STANDARD FORM 330 ,,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.