<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Michael Madsen, RLA Landscape Architecture a. TOTAL I b. ~ITH CURRENT FIRM
<br /> 6
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Kimley-Horn and Associates, Inc., Miami Beach, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br /> Bachelor of Science/Business Administration/Florida State University FL/RLA/LA6666994
<br /> Master of Landscape Architecture/Landscape Architecture/University
<br /> of Florida
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.)
<br /> American Society of Landscape Architects (AS LA) Florida Chapter ASLA Conference co-chair
<br /> ASLA Miami-Dade/Monroe County Section Chair ASLA National Student Representative
<br /> Past President, University of Florida ASLA Student Chapter LABASH 2004 PR/Marketing Committee Chair
<br /> United States Green Buildina Council (USGBC) Miami-Dade County Urban Horticulture Committee
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> MET2 PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Miami, FL
<br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br />a. Served as landscape architect on the design team for this project composed of a class A office building and five-star hotel
<br /> connected by a parking structure with a pool deck on top. The 48-story office building is a uniquely sculpted design destined to be a
<br /> main point of interest in the downtown revitalization effort. The hotel building will have 360 guestrooms that spread out over 20
<br /> floors. Urban Resource Group was involved in this project from its inception, dealing with the very challenging urban redevelopment
<br /> site with many constraints. This project is ongoing; total project cost: $330,000; construction cost: $330 million.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 710/Beeline Highway Design PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> FOOT District Four 2007* (design) 2009 (Phase 1)*
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br />b. Provided landscape and irrigation services for this project in the City of Riviera Beach. The combined length of both projects is 5.33
<br /> miles. The western project consists of the addition of two new lanes to provide a four-lane divided rural roadway, along with the
<br /> replacement of the existing two-lane bridge and the construction of a new two-lane parallel bridge. The eastern project consists of
<br /> the new construction to provide a four-lane divided urban roadway. *Phases 2 and 3 are ongoing; firm fee: $3.2 million; total project
<br /> cost (for Phases 1, 2, and 3): $29 million.
<br /> (1) TITLE AND LOCATION (eityandState) (2) YEAR COMPLETED
<br /> Sian Ocean Residences and Resort PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Hollywood, FL 2008
<br />c. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Sian is a hotel/condo redevelopment project spanning from Hollywood Beach to the Intracoastal Waterway. As a landscape
<br /> architect, designed plantings, hardscape, lighting and irrigation plans, and worked closely with the developer and civil engineering
<br /> team to coordinate drainage issues and necessary permitting. Firm fee: $800,000; total project cost; $12 million.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Midtown Miami Brownfield Redevelopment PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Miami, FL 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Served as landscape architect for the "Shops at Midtown Miami," the largest urban infill redevelopment project in Miami-Dade
<br /> County. The project is located on 56-acre Brownfield site previously owned by the FEC Railroad and involved planning, design, and
<br /> construction of all public and private infrastructure to serve 3,500 residential units, 800,000 square feet of commercial, and 15,000
<br />d. square feet of office space. Some of the major infrastructure components included FPL and telecommunications duct banks, storm
<br /> drainage wells, traffic signals and roadways, and a street car system. Infrastructure also included 12,500 linear feet of new 12-inch
<br /> water distribution mains and 6,500z linear feet of new 8-inch to 20-inch sanitary sewer mains, which required a 100-linear-foot bore-
<br /> and-jack beneath FEC Railroad and interconnection with an existing 72-inch live interceptor at Biscayne Boulevard. Kimley-Horn
<br /> designed water and sewer service connections for future parcel developments. Served as District Engineer for the Midtown Miami
<br /> Community Development District (CD D). The project consisted of 14 development blocks, which required extensive coordination
<br /> with multiple developers, design professionals, and contractors. The project was within the jurisdiction of the City of Miami, Miami-
<br /> Dade County, FDOT, Miami-Dade DERM, FDEP, and the Miami-Dade Water and Sewer Department (and also required
<br /> coordination and approvals from these agencies). Firm fee: $3.5 million; total project cost: $650 million.
<br /> (1) TITLE AND LOCATION (Ci/yand State) (2) YEAR COMPLETED
<br /> Grand Boulevard PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Sandestin, FL 2007 (Phase 1)
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Grand Boulevard at Sandestin is a high-end, new-urbanism town center development located in Walton County. As a landscape
<br /> architect with Kimley-Horn, responsibilities included permitting and design services for the office park, seasonal color beds,
<br /> hardscape designs, and median landscape and lighting design. Firm fee: $800,000.