My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VENCO Engineering Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
VENCO Engineering Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 4:33:50 PM
Creation date
11/17/2010 4:33:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 pr?jects, if not specified. <br />ComDlete one Section F for each proiect. J <br />21. TITLE AND LOCATION (City and State) <br /> <br />National Load Control Center Building <br /> <br />Kabul, Afghanistan <br /> <br />20, EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />3 <br /> <br />22, YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (II applicable) <br /> <br />2008 <br /> <br />2009 <br /> <br />23, PROJECT OWNER'S INFORMATION <br /> <br />a, PROJECT OWNER b, POINT OF CONTACT <br />Venco-Imtiaz Construction Company Michael Drannan, President <br />24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />+93 799218272 <br /> <br />Venco Engineering was contracted by VICC to provide <br />the Architectural and Engineering Design for this project <br />that consisted of a new one-story 8,700 square foot <br />building. The building design included the design and <br />installation of the foundation, an d all building services. <br /> <br />~./~., <br />'t D jcl:.t <br /> <br />'t <br />c:p <br />I <br />F""'" <br /> <br />=Cf' <br /> <br />I <br />[ <br /> <br />..1 <br /> <br /> <br />'~,.'.';-- <br /> <br />o r DL.., <br /> <br />D <br /> <br />The building consisted of a Lab, Open office area, Prayer <br />Room, Conference / Break Room, Training Room, and <br />both men and women's bathroom facilities. <br /> <br />,~.~~:.:t""~'! <br /> <br />Engineering services consisted of Project Scheduling, <br />detailed layout and project detailed design, equipment <br />and material specification preparation, detailed design of <br />the civil, structural and electrical systems, site <br />investigations and surveys, detailed design of the <br />building mechanical systems, submittal of contractor <br />generated documents for compliance review, resident <br />engineering, quality assurance / quality control, <br />operations and maintenance manual and instructions, <br />complete design engineering documentation, and as built <br />drawings. <br /> <br />""'~,, <br /> <br />Contract Value: $75,000 <br /> <br /> <br />~:.... <br /> <br />...~. <br /> <br />,,'l~ <br /> <br />[J <br /> <br />I <br /> <br />'1: tna!~;::ti_ <br />t~tw~,.o1 _ <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Venco Engineering Company, LLC Fort Lauderdale, Florida Subcontractor Design Engineer <br /> USA <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (CIty and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (612004) PAGE 3 <br /> <br />Venco-Imtiaz Construction Company #2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.