My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHAW Environmental, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
SHAW Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2010 9:54:45 AM
Creation date
11/22/2010 9:42:45 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br /> <br />.~ <br />~ <br />en <br />::::> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />submission to the state agencies during possible <br />permit modifications. <br />01/2005 - 06/2006, Lead Engineer, Shaw <br />Environmental & Infrastructure, Inc. <br />\,\'orked as the lead water distribution and wastewater <br />collection engineer for the redesign of the existing 78-1- <br />unit military family housing area. The private developer <br />who leases the property for the next 50 years is replacing <br />all the housing units currently at the site over the next 5 <br />years. The reconfigurations recluired new infrastructure <br />to be designed for bid solicitations and environmental <br />permitting. \Vork included the re-routing of water <br />distribution piping through the ne\v layout of homes, <br />proper zoning of the \vater s)'Stem, fIre supply and sizing <br />of individual services for single through multiplex units <br />and the supply of the required dra\vings and <br />specifications for the construction of the water and <br />wastewater portions of the project. Design included <br />interaction with existing base engineering and fire <br />department to satisfy concerns and recjuirements unique <br />to military infrastructure systems. The sanitary sewer <br />collection piping was also rearranged to accommodate <br />the re\vorked housing arrangement including the <br />addition of a number of new streets and dead ends that <br />were added. \,\'ork included the addition and <br />replacement design of collection mains to transmit <br />sewerage to the existing base collection system for <br />disposal, sizing and layout of sanitary mains and sen'ices <br />to each neighborhood and building location. <br /> <br />11/1991 - 06/2004, Task Engineer, Shaw <br />Environmental & Infrastructure, Inc. <br />Designed and re\'ised P&IDs for power plant HRSG <br />and cooling tower chemical feed systems for <br />purchase, reviewed and approved manufacturers <br />dra\V-ings of chemical feed system equipment and <br />water sampling systems. Supported lead engineer by <br />completing reviews of required system information, <br />Owner/Vendor changes, and routing design and <br />drawings for inter-discipline re\'iew. Supported lead <br />engineer with review of design documents for vendor <br />supplied and installed zero liguid discharge water <br />treatment system at site. Constmcted a multi faceted <br />water balance and process flow diagram to <br />incorporate all aspects of system operation including <br />the zero liquid discharge system to assist plant Owner <br />with the daily nomination of the plants raw water <br />requirement for multiple operational conditions. <br />Provided review of bids from chemical feed system <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />OGC 122006T <br /> <br />bidders and the Owner supplied demineralization bids <br />for conformance with the specifications. \Vorked on- <br />site with project management personnel utilizing the <br />CEMs system information to report emissions <br />violations. Constructed backup documentation to <br />support each \'io!ation, \'erify its authenticity, and <br />prepare the proper reports to the permitting board <br />detailing the reason and the steps taken to prevent <br />future violations. Interfaced with CEMs vendor to <br />have changes made to system to correctly display and <br />collect recluired information and ensure the proper <br />reporting of the information for regulatory purposes. <br />· Constmcted, modified, and reviewed detailed mass <br />balance calculations for a chemical weapons <br />demilitarization facility including all process licluids <br />associated with the neutralization process to detail <br />quantities for offsite disposal and eCluipment sizing. <br />t\Iaintained and updated block-flow diagrams to <br />correlate to revised P&IDs and system design <br />changes. Constructed detailed area descriptions of <br />multiple operational areas within the containment <br />building for use b~' process system operators to <br />determine operation of treatment area and for review <br />of hazards contained within the area. Revie\ved <br />system descriptions drafted by other disciplines within <br />the project to maintain reporting continuity within <br />reports as \vell as technical content. <br />Brought in to conduct walk-downs of the <br />demineralized \vater s)'Stem supplied and installed by a <br />previous contractor that was not yet operational. <br />Reviewed P&IDs, installed equipment, and changes <br />made to the system by the client and pre\'ious <br />engineering contractor. SupetTised craft personnd to <br />complete the installation of the remaining system <br />eCluipment and constructed / maintained punch-list <br />during work at site. Verified design by previous <br />vendor of demineralization system to accommodate <br />the current and future raw water supplies. Designed <br />and oversaw changes to upgrade the chemical feed <br />systems, instrumentation system and PLC controls to <br />maintain proper system operation and decrease the <br />manual monitoring requirement for plant operators. <br />Reviewed all demineralization vendor P&IDs and <br />marked up drawings as changes were made for final <br />editing as record copies. Oversaw startup of the <br />demineralized water system to verify design criteria <br />were met and system operated to client specifications. <br />Troubleshot the as-built regeneration chemical feed <br />systems and modifIed the design to accommodate <br />specific site issues and storage locations of bulk <br />chemicals to allow proper regeneration of the mixed <br />bed de-ionization systems. Provided educational <br /> <br />MICHAEL POWERS <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.