Laserfiche WebLink
<br />. <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />'" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br /> <br />.~ <br />~ <br />'" <br />::::> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />classes to the site plant operators in the operation and <br />maintenance of the new treatment system prior to <br />takeO\'er from the construction contractor. <br />. Designed and re\'ised P&IDs for power plant I-IRSG <br />chemical feed system, demineralized water, sampling <br />system and \vastewater disposal system in preparation <br />for construction. Re\'iewed regulations regarding <br />storage and use of chemicals on Long Island for use <br />by project to comply with County regulations. <br />Supported other disciplines \V'ithin the job to facilitate <br />changes to system designs to maintain environmental <br />compliance. Constructed a water balance to <br />incorporate all aspects of system operation to support <br />the plant Owner with the estimation of raw \vater <br />requirements and equipment sizing. ~Iaintained <br />environmental budget to maintain cost and schedule <br />for environmental portion of project. Preformed <br />calculations for design and specification of I-IRSG <br />chemical feed pumps, waste\vater, and demineralized <br />water pumps and head-loss calculations for piping in <br />each system. <br />. Designed and installed numerous Soil Vapor <br />Extraction r\ir Sparging systems as well as <br />biosparging systems for the removal of contaminates <br />at numerous industrial and manufacturing facilities. <br />Design engineer, pilot testing, and construction <br />supervisor for the installation and startup of <br />numerous dual phase biorcmediation cells and <br />groundwater remediation systems to remO\'e gasoline, <br />chlorinated compounds, in-situ jet fuel and other <br />contaminates to promote biodegradation. Activities <br />included coordination and contracting of construction <br />\'enclors including electrical, mechanical, building, and <br />excantion vendors to build the designed system to <br />the project schedule and budget. Installations include <br />remediation equipment within the treatment building <br />including blowers, system controls. The system <br />installations included o\'er 2.5 miles of process pipe, <br />70 extraction wells and all electrical and mechanical <br />systems. Constructed multiple SVE/ AS treatment <br />trailers including all piping and mechanical work as <br />well as electrical and control design for operation of <br />trailer. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />OGC122006T <br /> <br />MICHAEL POWERS [2:] <br />