My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHAW Environmental, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
SHAW Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2010 9:54:45 AM
Creation date
11/22/2010 9:42:45 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />0:: <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />Cl <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br /> <br />.~ <br />~ <br />'" <br />::::> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />launchers, recei\'ers, \'alves & fittings to clean the <br />pipeline. The Unit 1 and 2 systems are scheduled for <br />operation in fall 2007 and the Unit 3 FGD system is <br />scheduled for 20 lO. <br /> <br />Pennsylvania Power & Light - Brunner Island- <br />Utility Relocation Project (2005). ~Ir. Raine was Lead <br />Engineer and investigated the location of existing plant <br />utilities at Brunner Island Generation plant in the area <br />designated for the installation of Flue Gas <br />Desulphurization (FGD) facilities. He initiated a <br />drawing reyiew and prepared an electronic map <br />depicting the location and depth of cO\'er for all existing <br />utilities in the subject area. The information will be <br />utilized by the FGD design engineers during site <br />de\'Clopmen t. <br /> <br />Dominion - Chesterfield Emission Enhancement <br />Projects - Piping Relocation Project (2003 to 2004). <br />Shaw is the selected contractor to Engineer, Procure and <br />Construct (EPC) se\'eral emission enhancement projects <br />related to the Chesterfield Generating Station, <br />Chesterfield, VA. As part of this project, t\Ir. Raine was <br />Lead E-:ngineer during the preparation of specifications <br />and drawings necessary to contract the supply, <br />fabrication, installation and testing of fuel oil, waste <br />water and fire protection piping relocations, including all <br />required steel pipe supports and their foundations at the <br />Chesterfield Station. The piping relocations were <br />necessary to complcte a secondary containment dike to <br />surround the existing Unit No.8 Fuel Oil Tank. The <br />piping relocations have been completed. <br /> <br />Tennessee Gas Transmission - Pipeline Appraisal- <br />Schoharie County, NY (2003 to 2005). Mr. Raine <br />prepared a detailed capital cost appraisal for one 8500 <br />hp, natural gas compressor station and approximately 55 <br />miles of natural gas transmission pipelines in Schoharie <br />Coun ty, New York. The appraisals arc part of <br />continuing litigation between Schoharie County and <br />Tennessee Gas Transmission over property taxation <br />\'aluations. ~lr. Raine will provide expert testimony <br />during future court appearances representing Tennessee <br />Gas Transmission. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br />OGC 122006T <br /> <br />Iroquois Natural Gas Transmission System (1999 to <br />2004). t\Ir. Raine was Project Engineer for Iroquois Gas <br />Transmission S\'stem's (IGTS) Eastchester Extension <br />Project. During the permitting phase, he assisted in the <br />preparation of the FERC Enyironmental permit. <br />During detailed design, he \vas the Project Engineer and <br />Professional Engineer responsible for the mechanical <br />design of five gas compression facilities totaling over <br />40,000 horsepower, approximately 1-1/2 miles of 24" <br />transmission pipeline and a 360 mmscfd natural gas <br />metering and pressure regulation (M&R) facility. During <br />construction, he was the Resident Engineer responsible <br />for the technical installation and operation of the t\I&R <br />facility. <br /> <br />Hunts Point t\letering & Pressure Regulation Facility - <br />At the terminus of the Eastchester Extension marine <br />pipeline, S&W designed a natural gas metering & <br />pressure regulation facility located at the existing <br />Consolidated Edison of NY's Hunts Point Compressor <br />Station. The facilit\, was designed to meter, preheat and <br />control the tlow of IGTS gas sales into Con Ed's <br />\,\'estchester latcral. Gas sales arc measured through a <br />24" ultrasonic tlow meter. Gas preheating is <br />accomplished \'ia two (lOOo!" redundant) 20 <br />mmBTU /hr, Johnston hot \vater heaters. [-!cat is <br />exchanged \vith the process gas through t\vo (1000/0 <br />redundant) shell and tube heat exchangers. Flow control <br />and pressure regulation is performed through three (SO'Yt, <br />redundant) runs of Fisher control vakes. <br /> <br />Eastern Shore Natural Gas (2000 to 2001). As <br />Project Engineer, Mr. Raine was responsible for the <br />preliminary and detailed design of a 3,300 horsepmver <br />mainline natural gas compressor station in Daleville, <br />Pennsvlvania. The gas compressor station consisted of <br />two, Caterpillar G3606-LE-TI\-130 natural gas engines <br />rated to 1,665 bhp @ 1,000 rpm driving t\vo, Ariel <br />JGC/.f, t\vo throw, single stage, reciprocating natural gas <br />compressors. The duration of the project was <br />approximately one year and had a budget of $8 million. <br /> <br />North Carolina Natural Gas (1998 to 1999). [\s <br />Project Engineer, t\Ir. Raine was responsible for the <br />design and construction of a 3,300 horsepower mainline <br />natural gas compressor station in Clayton, North <br />Carolina. The gas compressor station consisted of t\vo, <br />Caterpillar G3606-LE-TA-130 natural gas engines rated <br /> <br />BRUCE R. RAINE D <br />
The URL can be used to link to this page
Your browser does not support the video tag.