My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHAW Environmental, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
SHAW Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2010 9:54:45 AM
Creation date
11/22/2010 9:42:45 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />.i <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />-' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />Peoples Gas Light & Coke Company (Dec 1992 to <br />Oct 1993). As Lead ~Iechanical Engineer, was <br />responsible for the design calculations, specifications <br />writing, system modeling, carbon and stainless steel <br />piping design, heating and ventilation design, and onsite <br />construction field engineering for a $6.5 million liquefied <br />natural gas plant vaporization system. During the <br />design, he prepared process and instrumentation <br />diagrams and detailed mechanical installation piping <br />drawings for hot water/ ethylene glycol, liquefied natural <br />gas, instrument air, heating and ventilation, and natural <br />gas fuel piping systems. He also prepared contract <br />specifications and prepared all mechanical nkes and <br />equipment purchasing specifications. During <br />construction, he received all equipment, made field <br />moditlcations, and inspected the work of the ~[echanical <br />Contractor. This plant has been in operation since <br />October 1993. <br /> <br />Granite State Gas Transmission, Incorporated (Mar <br />1992 to Dec 1992). As Lead t\[echanical Engineer, he <br />designed 1-1/2 miles of 12"-.312" wall thickness, high <br />tensile strength natural gas pipeline in Newington, New <br />Hampshire. I-Ie prepared the construction installation <br />specification, specified line pipe, \'akes, coatings, and <br />construction procedures. He prepared and re\'ie\ved <br />drawing details and pipeline alignment sheets. During <br />the construction phase, he was onsite as Pipeline <br />Ins pector \vorking wi th the ins talla tion con tractor <br />inspecting all work for conformance with the <br />specification. As a part of this project, he inspected the <br />installation of 3,000 feet of 12" carbon steel and 8" <br />polyethylene pipe installed from a transmission pipeline <br />to a local electrical pO\ver producer. He also assisted in <br />the inspection of a natural gas pressure reduction and <br />metering facility at the same power station. <br /> <br />North Country Pipeline Corporation (Nov 1991 to <br />Dec 1991). As ~Iechanical Engineer, ~[r. Raine assisted <br />in a field pipeline alignment sur\'CY for a future 12" high <br />pressure, natural gas pipeline associated with a co- <br />generation facility to be built in Platts burgh, N ew York. <br />l\Ir. Raine walked most of the pipeline right-of-way and <br />marked the proposed alignment, met with the local <br />landowners and prepared all road crossing detail <br />drawings. Used tax and highway maps to determine <br />property boundaries. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C 122006T <br /> <br />Scott Paper Corporation Oune 1991 to Nov 1991). As <br />Lead ~Iechanical Engineer, ~Ir. Raine produced the <br />piping design, hydraulic analysis and specification writing <br />for a three mile, gravity feed, 32" polyethylene water <br />effluent pipeline for a tissue cO\1\'erting facility in <br />Owensboro, Kentucky. t\[r. Raine supervised the <br />generation of computerized pipeline alignment drawings <br />and details. Designed one cased road and railway <br />crossing plan and se\'eral hydraulic structures allO\ving <br />water to flow into the Ohio River. He represented <br />Stone & Webster at the pre-bid meeting as the design <br />engineer answering questions from potential contractors. <br /> <br />BRUCE R. RAINE Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.