Laserfiche WebLink
<br />James A. Barrack Jr. <br /> <br />. <br /> <br />Why Selected as Key Personnel for Contract <br /> <br />. 26 years of experience in the preparation of <br />site plans on infrastructure projects including <br />tunnels and maintenance facility layouts and <br />designs <br />. Experienced manager of design teams on large <br />infrastructure projects <br /> <br />Education <br /> <br />B.S., Ci,"il Engineering, Uni,'ersity of r,[aryland at <br />College Park <br /> <br />1\I.S., Ci,'il Engincering (fransportation), Uni,"ersity of <br />1\[aryland at Collcge Park <br /> <br />t\Ianagement Seminar, \'\'orcester Polytechnic Institute <br /> <br />Boston University, certified financial planning courses <br /> <br />Registrations <br /> <br />Professional Engineer: t\L-\, r,[D, GA, VT <br /> <br />. <br /> <br />Background Summary <br /> <br />i\[r. Barrack has 26 ycars of expcrience in the <br />transportation industry. Currentl!", as a Senior Lead <br />Engineer, he is responsible for the preparation of site <br />plans, highway plans/profiles, traffic impact studies, <br />traffic safety studies, parking studies, traffic signal plans, <br />traffic control plans, tunnel plans, profilc and station <br />studies; maintenance facility layouts and designs, <br />technical specifications, construction cost estimates, and <br />project schedules. <br /> <br />1\[r. Barrack is also involved in the preparation of cost <br />and technical proposals for military family housing <br />projects, footprint bridgc projects, and traffic-relatcd <br />proposals. <br /> <br />. <br /> <br />Prior to joining Shaw E + I, t\[r. Barrack was the Unit <br />Manager of traffic operations at HMt\[ Associates, Inc. <br />where he was responsible for the technical preparation <br />and budget administration of traffic projects for the <br />public and private sector. Prior to joining HMM, Mr. <br />Barrack was a Civil Engineer at Greenhorne and <br />O'l\Iara, Inc. in Greenbelt, t\ID, where he was <br />responsible for preparing traffic studies, civil highway <br />plans, specifications, and cost estimates. <br /> <br />Relevant Experience <br />1991 - Present, Senior Lead Engineer, <br />Shaw Environmental & Infrastructure, Inc. <br />FEMA - IA T AC, Bring New Orleans Back, LA. <br />Project engineer responsible for inspections of City- <br />owned buildings and compilation of existing <br />data/reports and preparation of cluantity estimates for <br />necessary repair work. The inspections included over <br />100 city-owned buildings, and invoked <br />repairs/replacement of the roof system, windows, <br />skylights, walls, and missing or damaged roof mounted <br />ec!ulpment. <br /> <br />Experience includes: <br />Hanscom Family Housing (client -American Eagle <br />Design Build Studio). Project t\Ianager responsible <br />for the civil and utility designs for demolition of 850 <br />housing units and construction of 784 housing units and <br />5 neighborhood centcrs. The project included design of <br />8 miles of ncw roachvays, parking arcas, 350 drainage <br />structures, 8 detention areas and 7 undcrground <br />infiltration gallerics, firc protection, water distribution <br />and a sanitary collection system, natural gas, electrical <br />and communication systems. Our design team also <br />prepared the documents required to process the State <br />and local environmental permits. Thc dcsign fce is <br />confidential (internal client). Site design and <br />environmental permitting was completed in April 2006. <br />Construction is planned for mid 2006 through 2010. <br /> <br />Civil and Transportation Projects Division (Feb <br />1991 to Present). As Senior Lead Engineer, responsible <br />for the preparation of the following design projects, <br />studies and task assignments. <br /> <br />Massachusetts Bay Transportation Authority, <br />Southampton Street Maintenance Facility <br />(Contracts E02CN21 and E02CN22). Lead civil <br />engineer responsible for the preparation of final plans, <br />specifications, quantity and cost estimates for the new <br />Silver Linc Bus 1\Iaintenance Facility. The new facility <br />will house and maintain 77 sixty-foot articulated buses. <br />The contract required relocation of Moore Street, design <br />of a 250-car parking garage, maintenance building, <br />fueling building, wash and degrease building, and a <br />transportation building. Numerous design issues <br />included a contaminated site which required extensive <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />JAMES A. BARRACK JR. <br /> <br />06C122006T <br />