Laserfiche WebLink
<br />. <br /> <br />...i <br />.. <br />U) <br />o <br />"- <br />o <br />c:t: <br />"- <br />U) <br />I <br />>- <br />u.. <br />o <br />w <br />'" <br />.. <br />"- <br />~ <br />>- <br />>= <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />>= <br />to <br />0:: <br />>- <br />U) <br />W <br />c:t: <br />W <br />I <br />>- <br />o <br />>- <br /> <br />.~ <br />=> <br />U) <br />'!? <br />>- <br />w <br />W <br />I <br />U) <br />U) <br />I <br />>- <br />z <br />o <br />o <br />w <br />Z <br />;;' <br />>- <br />z <br />o <br />to <br />.. <br />>- <br />.. <br />o <br />u.. <br />o <br />w <br />c:t: <br />=> <br />U) <br />'3 <br />to <br />U) <br />o <br />c:t: <br />o <br />w <br />U) <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Andrew K. Fairbanks, P.E. <br /> <br />Education <br /> <br />I\I.s., Ci,'il Engineering, N ortheas tern University, 1981 <br /> <br />B.E., Ci,'il Engineering, University of I\[assachusetts, <br /> <br />1975 <br /> <br />Registrations <br /> <br />Professional Engineer: Structural, M,\ <br /> <br />Relevant Experience <br />10/2006 - Present, Project Engineer IV, <br />Shaw Environmental & Infrastructure, Inc. <br />Responsibilities include pro,'iding support to client <br />projects and office staff as a senior technical consultant <br />as well as technical proposal preparation including <br />estimating, conceptual design, logistics, and technical <br />\\TI tlllg. <br /> <br />The following is a summary of kcy projects: <br />Structural Engineer, Mercer Generating Station, <br />PSE&G, NJ, 01/2007 - Present. In support of the <br />project cstimatc, 0.Ir. [7airbanks dcsigncd thc stiffcncrs <br />for a portion of the Unit I & 2 duct\vork. <br /> <br />Civil/Structura[ portion of proposal, Moab Tailings <br />Remediation Proposal, Department of Energy, <br />Moab, UT, 11/2006 - Present. Thc projcct proposal is <br />to cstablish the infrastructurc to relocatc 16 million tons <br />of low level radioacti,'c uranium tailings from Moab, <br />Utah to a disposal ccll site 30 miles away and <br />dcmonstrate the process by moving 2.5 million tons. <br />E,'aluation of se,'eral alternati,'es for excavation and <br />blending of the pile materials were pcrformed as well as <br />determining the most cost effecti,'e and lowest risk <br />method of moving the material to the railhead which is <br />200 feet above the pile and on the side of a stcep hill. <br /> <br />02/2003 - 10/2006, Project Manager, Del- <br />Jen, Inc, Services, Rolling Hills Estates, <br />CA <br /> <br />Project Manager in the services division with projccts <br />ranging from Base Operating Services (BOS) Contracts <br />on military installations to hurricane disastcr relief <br />contracts. <br /> <br />The following is a summary of key projects: <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />Corporate Consultant, Hurricane Katrina FEMA <br />Trailer Maintenance, FEMA, Baton Rouge, LA, <br />04/2006 - 10/2006. At project startup, Mr. Fairbanks <br />assistcd in setting up subcontracts, the quality control <br />function and e\'aluation, and site logistics. <br /> <br />Project Manager, Hanscom AFB BOS Contract, <br />U.S.Air Force, Hanscom AFB, 02/2003 - 04/2006. <br />As Project l'.[anagcr for the Base Operating Contract <br />(BOS) l'.Ir. Fairbanks responsibilities consisted of all <br />aspects of thc operation of the basc infrastructure <br />including <br /> <br />. l'.Ianagc the 150 person di,'crse workforce consisting <br />of a combination of union cmployees, professional <br /> <br />enginccrs, and busincss staff. <br /> <br />. rdaintain o"cr 200 structurcs on base and thc <br /> <br />infrastructure that supported them. <br /> <br />. Perform and managc dcsign and construction projccts <br />on basc and at the () remotc locations owned b\. the <br />base totaling bct\vcen 5 and 10 million dollars <br /> <br />annually. <br /> <br />. t\Iaintain thc 800+ landscaped acres <br /> <br />. I\Iaintain and pcrform snow rcmm'al for the 12 miles <br /> <br />of basc roadways and -1-0 parking lots. <br /> <br />. Sta~' within thc ccilings for all 15 contract linc itcms <br /> <br />with a total annual budgct of onr S 161'.1. <br /> <br />. f\Ianagc the project programming structure for thc <br />base funding relluirements <br /> <br />. Train the 2000 military members on base in <br />dcploymcn t readincss <br />. ,\dminister the base housing and dormitory <br />assignment program <br />. Logistics <br />. Quality control <br /> <br />. Em'ironmental monitoring and operation of <br />elwironmental cleanup projccts and mitigation efforts <br />Interfacing with the military base leadership as well as <br />the govcrnmcnt ovcrsight team. <br /> <br />Accomplishments: <br />Repeated Award Fees in the Excellent Category <br /> <br />Awards/Client Commendations: <br /> <br />Oel-J en Customer Service Project of the Year 2005 <br /> <br />ANDREW K. FAIRBANKS <br />