Laserfiche WebLink
<br />e <br /> <br />-" <br /><< <br />U) <br />a <br />a. <br />a <br />'" <br />a. <br />U) <br />I <br />f- <br />... <br />a <br />w <br />" <br /><< <br />a. <br />~ <br />f- <br />;:: <br />W <br />I <br />f- <br />Z <br />a <br />z <br />a <br />;:: <br />u <br />(i' <br />f- <br />U) <br />W <br />'" <br />W <br />I <br />f- <br />a <br />f- <br /> <br />ei <br />U) <br />'!? <br />f- <br />W <br />W <br />I <br />U) <br />U) <br />I <br />f- <br />Z <br />a <br />o <br />w <br />z <br />;;: <br />f- <br />Z <br />a <br />u <br /><< <br />f- <br /><< <br />o <br />... <br />a <br />w <br />'" <br />::> <br />U) <br />g <br />u <br />U) <br />o <br />'" <br />a <br />w <br />U) <br />::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />New Hampshire. The project included denloping <br />work-flO\vs for the incorporation of data from various <br />sources into the G IS. In addition he was responsible for <br />training city personnel in the use and updating of thc <br />G IS along with automatcd civil design software. <br /> <br />Structural Designer, Beaver Valley Power Station <br />Unit No.2, Duquesne Light Company, Project <br />Location, 07/1981- 04/1987. As Structural Designer <br />he was responsible for the documentation, maintenance <br />and design of calculations for the fuel and <br />decontamination building for the Duquesne Light <br />Company, Bea\'er Valley PO\ver Station - Unit 2. In <br />addition to concrete and steel design, responsibilities <br />included using computer analysis to design electrical <br />conduit supports and to determine the adequacy of <br />embedded steel plates subjected to support loadings. <br /> <br />01/1985 - 01/1986, Supervisor, Eastern <br />Land Survey Associates, Inc., Peabody, <br />MA <br /> <br />. As SupelTisor - Survey Departmcnt, responsibilities <br />included the following: <br /> <br />. Supcr\'isor of field and office sUr\'ey personnel <br /> <br />responsible for assigning and monitoring the <br />completion of work. <br /> <br />. Project r.[anager responsible for the completion of <br />\'arious civil engineering projects. <br /> <br />. Design of residential and commercial civil engineering <br /> <br />projects including roadway and drainage design. <br /> <br />. I\ttendance at mectings of regulatory authorities for <br /> <br />project review and apprrwal. <br /> <br />01/1979 - 01/1984, Project Engineer, <br />Stone & Webster, Stoughton, MA <br />Duquesne Light Company, Beaver Valley Power <br />Station - Unit 2 Guly 1981 to Jan 1983). \'(lorkcd as <br />Structural Designer in the Structural Group of thc site <br />engineering officc at Beavcr Valley Power Station - Unit <br />No.2, Shippingport, Pf\ for Ducluesne Light Company. <br />Responsibilities included steel and concrete design, <br />resolving structural interferences with other disciplines, <br />handling contractor's quality controls re(luests for <br />information, electrical conduit support design, drafting <br />production, and general site engincering responsibilities. <br /> <br />During l\Iarch and April of 1983, on loan to work for <br />the Houston Lighting & Power Company designing <br />drainage and other structures for the l\Ialakoff Power <br />Station. <br /> <br />Virginia Electric Power Company Gan 1981-July <br />1981). Worked as Designer attached to the task force <br />evaluating masonry block walls for Virginia Electric <br />Power Company's North Anna and Surry Power Plants. <br />Responsibilities included using computer analysis to <br />determine the ade(luacy of masonry block walls and <br />remodeling inade(luate ones. <br /> <br />DuringJune of 1983, on loan to \vork for the Virginia <br />Electric Power Company at their Chesterfield Power <br />Station during a pO\ver outage. Responsibilities included <br />engineering support for the replacement of a damaged <br />boiler column. <br /> <br />Azzawiya Oil Refining Company (Dec 1079 to Jan <br />1981). \\'orked as Designer in thc Structural Group for <br />the ,\zzawiya Oil Refining Company, [nc., Ethylene <br />Project at Ras Lanuf, Libya. Responsibilities included <br />steel and concrete design and drafting production. <br /> <br />Indianapolis Power and Light Company (Sept 1979 <br />to Dec 1979). Worked as Senior Draftsman in the <br />Concrete Group of the Structural Division for the <br />Indianapolis Power & Light Company, Petersburg <br />Station - Unit No.4. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />STEPHEN T. LAMONICA 3 <br /> <br />06C122006T <br />