My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Harvard Jolly #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Harvard Jolly #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2010 9:07:14 AM
Creation date
12/1/2010 9:05:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, If not specified. <br />ComDlete one Section F for each Droiect.J <br />21. TITLE AND LOCATION (Clly and State) <br />City of Hollywood- Continuing Contract <br />Rotary Park Improvements <br />Hollvwood, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />2 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />2005-2008 2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c POINT OF CONTACT TELEPHONE NUMBER <br />City of Hollywood Stephen Groh 305-556-3800 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br /> <br />Program consisted of demolishing the existing maintenance / <br />concession and restroom/meeting buildings; and the design of a new <br />3,800 sf facility. The building has restrooms, a concession stand, a <br />janitor's closet, a LAN closet, an office, a maintenance room for <br />public works, field storage and a meeting room with storage. There <br />are paved walking paths to connect the field spectator areas with the <br />concession/restrooms and the parking area, making this park fully <br />ADA compliant. Services included complete architectural services <br />through construction administration. Landscape architectural services <br />included the total redesign of multiple ball fields including new sod, <br />specialty irrigation systems, as well as complete park design. <br /> <br />.~. ':~-,.q <br /> <br />" <br /> <br />-- <br /> <br />r <br />:t-~~~f.~_1 t <br />1 "' J <br /> <br />.") <br /> <br />l' _~It <br /> <br /> <br />................ <br />I <br /> <br />25. FIRMS FROM SEeTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (OtyandStale) (3) ROLE <br />a. Harvard Jolly, Inc. Ft. Lauderdale, FL Architectural Services <br /> (1) FIRM NAME (2) FIRM LOCATION (OtyandState) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (Cllyand State) (3) ROLE <br />C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.