Laserfiche WebLink
plan. All traffic control costs shall be a part of the unit price proposal and shall not be paid for <br />separately. <br />3.7 F. RIGHTS -OF -WAY (see attached man for locations) <br />F1. through F30. This proposal item is to include the supplying of all necessary materials, supplies, <br />labor, equipment, fuel, and other miscellaneous necessities to fully maintain the general condition of the <br />City Street Rights -of -Way listed in this group. This work shall include, but not be limited to, weeding, <br />mowing all grass such that it never exceeds 4 inches in height under normal conditions or 5 inches in <br />height under drought conditions, irrigating (including the full maintenance and repair of the irrigation <br />system itself) all landscaped areas, maintaining and replacing (if necessary) any perennial plants, <br />removing all graffiti within thirty-six hours, blowing sidewalks weekly, daily removal of all litter, daily <br />cleaning and maintenance of all trash receptacles (where they exist), and daily inspection of all lighting <br />and street appurtenances. The City will supply all irrigation materials necessary under this item upon <br />written request by the proposer's Irrigation Specialist. In emergency situations, the Irrigation Specialist <br />may purchase the materials and will be reimbursed (at actual cost) by the City, but then only upon <br />receipt of both the proper documentation of the emergency nature of the work and the proper original <br />invoices for materials. <br />The intent of this description is to convey the requirement that the streets listed in this section shall be <br />maintained to a superior level such that they are the viewed by the public as the best maintained in the <br />area. It is this standard that will be required of the Proposers. <br />The supplying and placing of this item is separate and unique from the other proposal items also listed in <br />this package and the proposal price shown for this item will be considered full and total payment for all <br />normal ongoing operations. For any additional payments under this item, or any other, the service must <br />be specifically requested by the City for a unique and specific task. In areas of traffic, the proposal will <br />include all appropriate traffic control devices that conform to an approved Management of Traffic (MOT) <br />plan. Maintenance of Traffic shall be in accordance with the current edition of the Florida DOT Design <br />Standards (600 series), the Standard Specification for Road and Bridge Construction, and the Manual on <br />Uniform Traffic Control Devices, as a minimum criteria. This note should be included under all proposal <br />items that may include a work on FDOT roadways. All traffic control costs shall be a part of the unit price <br />proposal and shall not be paid for separately. <br />3.8 G. BEACH & BEACH ACCESS PATHS (see attached mat) for locations) <br />G1. This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to fully maintain clean City Beaches. This work shall <br />include, but not be limited to, litter and trash removal and mechanized raking. The intent of this <br />description is to convey the requirement that the public beaches within the City shall be maintained to a <br />superior level such that they are the viewed by the public as the best maintained in Southern Florida. It <br />is this standard that will be required of the Proposers. <br />G2. through G21. This proposal item is to include the supplying of all necessary materials, supplies, <br />labor, equipment, fuel, and other miscellaneous necessities to fully maintain the general condition of <br />the City Beach Access Paths listed in this group. This work shall include, but not be limited to, weeding, <br />mowing all grass such that it never exceeds 4 inches in height under normal conditions or 5 inches in <br />height under drought conditions, trimming all hedges, irrigating (including the full maintenance and repair <br />of the irrigation system itself) all landscaped areas, maintaining and replacing (if necessary) any plants, <br />removing all graffiti within twenty-four hours, blowing sidewalks daily, power washing sidewalks once a <br />month, daily removal of all litter, daily cleaning and maintenance of all trash receptacles (where they <br />exist), and daily inspection of all lighting and path appurtenances. <br />