My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spillis Candela
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-07-01) Architectural Design Svcs.
>
Spillis Candela
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:33:26 AM
Creation date
12/28/2010 2:26:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design
Bid No. (xx-xx-xx)
01-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spillis Candela DMJM was selected to provide compre- <br />hensive architectural, engineering, planning, and interior <br />design services forthe new Indian River CountyAdminis- <br />tration Center in Vero Beach. The project was subdivided <br />into three phases: <br />Phase 1 - Programming and Master Planning <br />Phase 11 - Architectural, Engineering and Interior <br />Design <br />Phase 111 - Construction Administration <br />Currently in the Programming and Master Planning Phase, <br />the new County Administration Center is anticipated to be <br />approximately 160,000 sf on a site adjacent to the exist- <br />ing County Administration Building. The new Center will <br />consolidate virtually all County functions under one roof to <br />provide the public with easier access, as well as improve <br />overall efficiency of County operations. <br />In addition to the new Administration Center, Spillis Can- <br />dela DMJM is also responsible for the design of a sepa- <br />rate County Purchasing and Storage facility. Depending <br />upon the utilization of the available land for this project, <br />SCDMJM will potentially be required to design a parking <br />structure to satisfy the parking requirements of the com- <br />plex. It is anticipated that the County will utilize the "Con- <br />struction Manager at Risk" approach as a project delivery <br />method. <br />SWIM Candela DMIM <br />
The URL can be used to link to this page
Your browser does not support the video tag.