My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(02-11-02) General Municipal Contract Svcs.
>
Calvin, Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:01:34 AM
Creation date
1/4/2011 2:21:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
General Municipal Contract Svcs.
Bid No. (xx-xx-xx)
02-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This document will also include information obtained from the City's Land <br />Development Code, Sign Code, Landscape Code and Engineering Standards <br />Manual. <br />The scope of this report will include a traffic engineering evaluation of all public <br />roadways throughout the community to identify specific areas that need traffic <br />related improvements such as safety enhancements, new or modified traffic <br />control devices, street lighting, new guardrail, removal of sight- distance obstruc- <br />tions, and additional curbing. Traffic count data should be collected at identified <br />locations for the purpose of examining geometric needs (turn lanes), traffic con- <br />trol modifications, and signal warrants. Pavement conditions and quality /visibility <br />of existing pavement marking were inspected and inventoried. Nighttime exami- <br />nation of signing and striping will be performed to determine where insufficient <br />reflectivity exists so that the appropriate refurbishing can be implemented. <br />Special bicycle and pedestrian needs or deficiencies will also be investigated and <br />addressed. Traffic calming treatments, such as paver bands will also be <br />considered at appropriate locations. <br />All roadways will be inspected and evaluated for possible asphalt overlay needs. <br />Additional concrete sidewalks will be considered and recommended for specific <br />locations throughout the community. <br />' The existing stormwater management system will be identified and site - specific <br />options will be developed for improving the drainage in the flood prone areas. <br />These improvements will include swale modifications and reshaping, installation <br />of additional storm sewer systems and outfalls and drainage deep well injections. <br />1 Entry signs and guide signs will be considered at various intersections within the <br />community. Areas in need of additional landscaping and irrigation will also be <br />identified and prioritized and plant species for these areas will be suggested. <br />Existing utilities will also be evaluated for conformance with City standards as <br />well as adequate landscape screening wherever required. <br />Project Management <br />At Calvin, Giordano and Associates, Inc. project management is used to organize <br />and meet the client's needs by standardize routine tasks and reduce the number <br />of tasks that could potentially be forgotten. Our project management teams <br />ensure that available resources are used in the most effective and efficient <br />manner. <br />The team leader initiates the project by establishing the "Scope of Work" and the <br />associated "Cost ". The team leader is also responsible for establishing the <br />timeline and assigning tasks to the various departments within CGA. The design <br />of the project begins at the "Kick -off Meeting ". The team is introduced to the <br />Section I <br />Sunny Isles Beach <br />Request for Qualifications - General Municipal Contract Services <br />December 20, 2002 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.