<br />Mr. Pippitt has served in the capacity of Deputy District
<br />Design Engineer in the Florida Department of
<br />Transportation's District 4 office for 10 years. His
<br />responsibilities during this period included managing
<br />the District's Quality Control section, acting as the
<br />District Pavement Design Engineer, District Estimates
<br />Engineer and District Specifications Engineer.
<br />PROJECT EXPERIENCE:
<br />Design
<br />Hallandale Beach Boulevard Bridge 227707- 1 -52 -01
<br />Replaced the existing bascule bridge over the Intra-
<br />coastal Water Way with twin bascule structures.
<br />Project also included the Flyover structure at the
<br />Intersection of Hallandale Beach Boulevard (SR -858)
<br />and Ocean Drive (SR -A1A), '/2 mile of roadway recon-
<br />struction & widening, lighting, signalization,
<br />landscaping, permitting, utility coordination and right of
<br />way mapping for acquisition.
<br />1 -95 Weigh in Motion Stations 231812- 1 -52 -01
<br />Design for the construction of two weigh stations on I-
<br />95 in Martin County for the Florida Department of
<br />Transportation's Motor Carrier Compliance Office. The
<br />Project, a blend of roadway and site development,
<br />includes grading, paving, drainage, architectural,
<br />lighting, permitting, utilities, signalization, weigh in
<br />motion instrumentation, surveillance system and
<br />lightning dissipation system for the site.
<br />1 -95 HOV From Forrest Hill Boulevard to South of
<br />Southern Boulevard 231919 - 2-52 -01
<br />Design for the addition of HOV lanes on this section of
<br />1 -95 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and bridge widening.
<br />1 -95 HOV From North of Southern Boulevard to
<br />North of Congress Avenue 231919 -0 -52 -01
<br />Design for the addition of HOV lanes on this section of
<br />195 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and replacement of two bridges
<br />crossing 1 -95.
<br />SR- 7/US -441 From Lake Worth Road to Belvedere
<br />Road
<br />A permit project by Palm Beach County for the
<br />construction of an 8 lane divided highway. The project
<br />includes widening and resurfacing, signalization,
<br />signing, lighting, ADA accommodations, transit
<br />accommodations, drainage, permitting, utility
<br />relocation, right -of -way acquisition and landscaping.
<br />SR -805 /SR -5 Dixie Highway /Olive Avenue Corridor
<br />Improvements 229754- 1 -52 -01, 229695- 1 -52 -01,
<br />229696- 1 -52 -01, 229867- 1 -52 -01, 229722- 1 -52 -01,
<br />229777 - 2-52 -01 and 229739- 1 -02 -01.
<br />These seven projects along the US -1 were designed in
<br />a cooperative effort between the Florida Department of
<br />Transportation and the City of West Palm Beach to
<br />Raymond J. Pippitt, P.E.
<br />PROFESSIONAL REGISTRATIONS
<br />CALVIN, GIORDANO 6 ASSOCIATES, INC.
<br />ENGINEERS SURVEYORS PLANNERS
<br />1
<br />Raymond J. Pippitt, P.E.
<br />Y PP
<br />Director, Highway Design
<br />'
<br />State of New Jersey No. L1002752
<br />Mr. Pippitt has over twenty -eight (28) years of experi-
<br />ence in project management. His primary area of
<br />expertise is highway design, work zone traffic control,
<br />1
<br />quality control and project management.
<br />EDUCATION
<br />Bachelor of Science in Civil Engineering, 1974
<br />'
<br />Newark College of Engineering (NJIT), Newark, New
<br />Jersey
<br />t
<br />t
<br />1�
<br />t
<br />Mr. Pippitt has served in the capacity of Deputy District
<br />Design Engineer in the Florida Department of
<br />Transportation's District 4 office for 10 years. His
<br />responsibilities during this period included managing
<br />the District's Quality Control section, acting as the
<br />District Pavement Design Engineer, District Estimates
<br />Engineer and District Specifications Engineer.
<br />PROJECT EXPERIENCE:
<br />Design
<br />Hallandale Beach Boulevard Bridge 227707- 1 -52 -01
<br />Replaced the existing bascule bridge over the Intra-
<br />coastal Water Way with twin bascule structures.
<br />Project also included the Flyover structure at the
<br />Intersection of Hallandale Beach Boulevard (SR -858)
<br />and Ocean Drive (SR -A1A), '/2 mile of roadway recon-
<br />struction & widening, lighting, signalization,
<br />landscaping, permitting, utility coordination and right of
<br />way mapping for acquisition.
<br />1 -95 Weigh in Motion Stations 231812- 1 -52 -01
<br />Design for the construction of two weigh stations on I-
<br />95 in Martin County for the Florida Department of
<br />Transportation's Motor Carrier Compliance Office. The
<br />Project, a blend of roadway and site development,
<br />includes grading, paving, drainage, architectural,
<br />lighting, permitting, utilities, signalization, weigh in
<br />motion instrumentation, surveillance system and
<br />lightning dissipation system for the site.
<br />1 -95 HOV From Forrest Hill Boulevard to South of
<br />Southern Boulevard 231919 - 2-52 -01
<br />Design for the addition of HOV lanes on this section of
<br />1 -95 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and bridge widening.
<br />1 -95 HOV From North of Southern Boulevard to
<br />North of Congress Avenue 231919 -0 -52 -01
<br />Design for the addition of HOV lanes on this section of
<br />195 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and replacement of two bridges
<br />crossing 1 -95.
<br />SR- 7/US -441 From Lake Worth Road to Belvedere
<br />Road
<br />A permit project by Palm Beach County for the
<br />construction of an 8 lane divided highway. The project
<br />includes widening and resurfacing, signalization,
<br />signing, lighting, ADA accommodations, transit
<br />accommodations, drainage, permitting, utility
<br />relocation, right -of -way acquisition and landscaping.
<br />SR -805 /SR -5 Dixie Highway /Olive Avenue Corridor
<br />Improvements 229754- 1 -52 -01, 229695- 1 -52 -01,
<br />229696- 1 -52 -01, 229867- 1 -52 -01, 229722- 1 -52 -01,
<br />229777 - 2-52 -01 and 229739- 1 -02 -01.
<br />These seven projects along the US -1 were designed in
<br />a cooperative effort between the Florida Department of
<br />Transportation and the City of West Palm Beach to
<br />Raymond J. Pippitt, P.E.
<br />PROFESSIONAL REGISTRATIONS
<br />Registered Professional Engineer
<br />State of Florida No. 33878
<br />1
<br />State of New Jersey No. GE028506
<br />Registered Professional Planner
<br />State of New Jersey No. L1002752
<br />PROFESSIONAL ASSOCIATIONS
<br />Florida Engineering Society
<br />National Society of Professional Engineers
<br />Institute of Transportation Engineers
<br />American Society of Highway Engineers
<br />'
<br />QUALIFICATIONS
<br />Mr. Pippitt's experience in project Management on
<br />Transportation Projects has included over 70 projects.
<br />The extent of his experience has included bridge
<br />replacement, bridge rehabilitation, new roadway
<br />construction, widening and reconstruction, milling and
<br />resurfacing and several traffic capacity and safety
<br />improvement projects.
<br />t
<br />t
<br />1�
<br />t
<br />Mr. Pippitt has served in the capacity of Deputy District
<br />Design Engineer in the Florida Department of
<br />Transportation's District 4 office for 10 years. His
<br />responsibilities during this period included managing
<br />the District's Quality Control section, acting as the
<br />District Pavement Design Engineer, District Estimates
<br />Engineer and District Specifications Engineer.
<br />PROJECT EXPERIENCE:
<br />Design
<br />Hallandale Beach Boulevard Bridge 227707- 1 -52 -01
<br />Replaced the existing bascule bridge over the Intra-
<br />coastal Water Way with twin bascule structures.
<br />Project also included the Flyover structure at the
<br />Intersection of Hallandale Beach Boulevard (SR -858)
<br />and Ocean Drive (SR -A1A), '/2 mile of roadway recon-
<br />struction & widening, lighting, signalization,
<br />landscaping, permitting, utility coordination and right of
<br />way mapping for acquisition.
<br />1 -95 Weigh in Motion Stations 231812- 1 -52 -01
<br />Design for the construction of two weigh stations on I-
<br />95 in Martin County for the Florida Department of
<br />Transportation's Motor Carrier Compliance Office. The
<br />Project, a blend of roadway and site development,
<br />includes grading, paving, drainage, architectural,
<br />lighting, permitting, utilities, signalization, weigh in
<br />motion instrumentation, surveillance system and
<br />lightning dissipation system for the site.
<br />1 -95 HOV From Forrest Hill Boulevard to South of
<br />Southern Boulevard 231919 - 2-52 -01
<br />Design for the addition of HOV lanes on this section of
<br />1 -95 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and bridge widening.
<br />1 -95 HOV From North of Southern Boulevard to
<br />North of Congress Avenue 231919 -0 -52 -01
<br />Design for the addition of HOV lanes on this section of
<br />195 in Palm Beach County. Project included milling &
<br />resurfacing, widening, drainage, permitting, utilities,
<br />lighting, retaining walls, and replacement of two bridges
<br />crossing 1 -95.
<br />SR- 7/US -441 From Lake Worth Road to Belvedere
<br />Road
<br />A permit project by Palm Beach County for the
<br />construction of an 8 lane divided highway. The project
<br />includes widening and resurfacing, signalization,
<br />signing, lighting, ADA accommodations, transit
<br />accommodations, drainage, permitting, utility
<br />relocation, right -of -way acquisition and landscaping.
<br />SR -805 /SR -5 Dixie Highway /Olive Avenue Corridor
<br />Improvements 229754- 1 -52 -01, 229695- 1 -52 -01,
<br />229696- 1 -52 -01, 229867- 1 -52 -01, 229722- 1 -52 -01,
<br />229777 - 2-52 -01 and 229739- 1 -02 -01.
<br />These seven projects along the US -1 were designed in
<br />a cooperative effort between the Florida Department of
<br />Transportation and the City of West Palm Beach to
<br />Raymond J. Pippitt, P.E.