My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(02-11-02) General Municipal Contract Svcs.
>
Calvin, Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:01:34 AM
Creation date
1/4/2011 2:21:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
General Municipal Contract Svcs.
Bid No. (xx-xx-xx)
02-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />C� <br />SR- 5 /US -1 Parker Bridge 229403- 1 -22 -01 <br />This project assessed the impacts of replacing and <br />widening a bascule bridge from a four lane to a six lane <br />structure. The study examined the impacts for three <br />different bridge alternatives. <br />Jungle Trail in Indian River County 230885- 1 -22 -01 <br />This project included a Phase 1 PD &E evaluation of <br />enhancement improvements to the historic Jungle Trail, <br />which paralleled the Indian River. Alternates evaluated <br />included passive recreational uses, preservation of <br />archaeological and environmentally significant sites and <br />stabilization of the banks of the river. <br />Planning Study <br />SR-0 and FEC Grade Separation 228572- 1 -22 -01 <br />This project evaluated the feasibility of constructing an <br />east -west grade separation over SR- 5 /US -1 and the <br />FEC Railroad in Indian River County. Eight locations <br />within the county were evaluated for feasibility including <br />Benefit to Cost analysis, environmental impacts and <br />socio- economic impacts. <br />Raymond J. Pippitt, P.E. <br />facilitate needed roadway improvements and redevelop - <br />ment efforts in the city. These projects included milling <br />1 <br />& resurfacing, pavement reconstruction, drainage, per- <br />mitting, curb & gutter, sidewalk, utility construction & <br />relocation, signing and signalization. The projects also <br />provided for Traffic Calming and aesthetic enhance- <br />ments including; roadway narrowing, decorative <br />lighting, raised intersection design, landscaped bulb - <br />outs and the construction of a circular plaza. <br />Other Deign Projects Include: <br />16th /17th Street in Indian River Co. 230872- 1 -52 -01 <br />SR- 5 /US -1 in Broward Co. 228092- 1 -52 -01 <br />SR- 5 /US -1 in Broward Co. 228092- 1 -52 -01 <br />Forest Hill Blvd. in Palm Beach Co. 229782- 1 -52 -01 <br />SR -715 in Palm Beach Co. 229717- 1 -52 -01 <br />SR -715 in Palm Beach Co. 229718- 1 -52 -01 <br />SR -729 in Palm Beach Co. 229719- 1 -52 -01 <br />Project Development and Environmental (PD &E) <br />Hallandale Beach Boulevard from 1 -95 to SR -7 <br />229901- 1 -22 -01 <br />This project assessed the impacts of reconstructing and <br />widening SR -858 from a four lane divided highway to a <br />six lane divided facility. The study examined the <br />impacts for three different construction alternatives. <br />t <br />C� <br />SR- 5 /US -1 Parker Bridge 229403- 1 -22 -01 <br />This project assessed the impacts of replacing and <br />widening a bascule bridge from a four lane to a six lane <br />structure. The study examined the impacts for three <br />different bridge alternatives. <br />Jungle Trail in Indian River County 230885- 1 -22 -01 <br />This project included a Phase 1 PD &E evaluation of <br />enhancement improvements to the historic Jungle Trail, <br />which paralleled the Indian River. Alternates evaluated <br />included passive recreational uses, preservation of <br />archaeological and environmentally significant sites and <br />stabilization of the banks of the river. <br />Planning Study <br />SR-0 and FEC Grade Separation 228572- 1 -22 -01 <br />This project evaluated the feasibility of constructing an <br />east -west grade separation over SR- 5 /US -1 and the <br />FEC Railroad in Indian River County. Eight locations <br />within the county were evaluated for feasibility including <br />Benefit to Cost analysis, environmental impacts and <br />socio- economic impacts. <br />Raymond J. Pippitt, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.