My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(02-11-02) General Municipal Contract Svcs.
>
Calvin, Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:01:34 AM
Creation date
1/4/2011 2:21:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
General Municipal Contract Svcs.
Bid No. (xx-xx-xx)
02-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Signalized Intersection Capacity Study, <br />Michigan <br />Study of capacity at 15 major intersections <br />throughout Lansing, Michigan and Detroit, <br />Michigan. Compared and contrasted the <br />performance of Greenshield's Equation, Highway <br />Capacity Software 2.4d and Netsim 5.0 regarding <br />capacity estimations. <br />Traffic Fatalities and Speed Limit Analysis <br />An analysis of the impacts varying speed limits <br />have upon traffic fatalities. Proposed mathematical <br />equation to estimate traffic fatalities based upon <br />economic variables. <br />Database Management, Lansing, Michigan <br />Development and application of GIS Interface with <br />traffic count inventory. <br />Lox Road Vegetative Recycling Facility, B.G. <br />Katz Property Maintenance, Palm Beach County, <br />Florida <br />Performed a trip generation study of similar facilities <br />to facilitate the analysis of the traffic impacts to the <br />surrounding roadway network of a 19 -acre vegeta- <br />tive recycling facility /nursery. <br />US -1 /Prima Vista Corridor Signal Optimization, <br />McDonald's Corporation, St. Lucie County, <br />Florida <br />Assessed the traffic impacts associated with the <br />proposed McDonald's restaurant. Adjusted US -1 <br />corridor signal timings based upon the develop- <br />ment's traffic impacts and mitigations. <br />Seminole Casino Traffic Study, North American Sports <br />Management, Inc., Coconut Creek, Florida <br />Evaluated the traffic impacts of the proposed casino, as <br />well as analyzed the access provided to /from the <br />development. Assessed those impacts with the DRI <br />framework. <br />IBIS Community Traffic Assessment, North American <br />Properties, Palm Beach County, Florida <br />Reviewed and reassessed the proportion of traffic each <br />land use in the community contributes to area roadways. <br />Successfully implemented the revised traffic allocation <br />saving our client several hundred thousand dollars. <br />Microscopic Simulation and Signalized Intersection <br />Delay, Florida <br />Initiated a study of 190 signalized intersection approaches <br />to determine the relationship between the 1997 Highway <br />Capacity Manual and COSIM 4.2 regarding the calculation <br />of signal delay. Proposed ranges of delay applied to <br />CORSIM results, which effectively simulate 1997 HCM <br />results. The concept was presented at the Transo 2000 <br />Conference. <br />Traffic Engineering Services, Village of Wellington, FL <br />Provision of Traffic Study, Site Plan and access reviews, <br />as well as a Public Transit Study, for the Village. <br />Eric Penfield, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.