My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(02-08-01) Sidewalk & Street Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 5:02:56 AM
Creation date
1/5/2011 9:08:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sidewalk & Street Improv.
Bid No. (xx-xx-xx)
02-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment of other manufacturers and vendors which will perform or serve the <br />requirements of the general design will be considered equally acceptable provided the <br />material, article, or equipment so proposed, is in the opinion of the Engineer, equal in <br />substance, quality and function. It shall not be purchased or installed by the Contractor <br />without the Engineer's prior written approval. <br />25. Plans and Working Drawings: <br />Certain plans supplied by the City accompany and supplement these Contract <br />Documents. The City through its Engineer shall have the right to modify the details of <br />these plans, to supplement these plans with additional plans or with additional <br />information as the work proceeds, all of which shall be considered as plans <br />accompanying these Specifications herein generally referred to as the "Plans ". In case of <br />disagreement between the Plans and Specifications, the Specifications shall govern. <br />The Contractor shall prepare whatever detailed working drawings are necessary to enable <br />him to fabricate, erect and construct all parts of the work in conformity with the plans and <br />Specifications. Working drawings shall include shop drawings and erection diagrams for <br />structural steel. Working drawings shall be submitted to the Engineer in quintuplicate; <br />two sets will be returned to the Contractor approved or showing the changes or <br />corrections required; if changes or corrections are required, five copies shall be <br />resubmitted until they are approved. <br />The Contractor shall report any errors or discrepancies found in the drawings to the <br />Engineer, who will make or approve necessary corrections. The City shall not be <br />responsible for errors or minor discrepancies of the Contractor's drawings, even though <br />approved, or for minor errors or minor discrepancies of the Engineer's drawings. <br />Payment for working drawings, revisions thereof, and for copies furnished, shall be <br />included in the amounts bid for materials or work. The Contractor shall furnish as many <br />sets of paper blueprint copies for working drawings as the City and the Engineer may <br />need for the work. The Contractor should allow a minimum of fourteen (14) calendar <br />days for the City's approval of shop drawings <br />26. Explosives: <br />No explosives or blasting shall be used or done in the project. <br />27. Subcontractors: <br />The Contractor is as fully responsible to the City for the acts and omissions of his <br />subcontractors and of persons either directly or indirectly employed by said <br />subcontractor, as he is for the acts and omissions of persons directly employed by him. <br />Nothing contained in the Contract Documents shall create any contractual relations <br />between any subcontractor and the City. <br />28. Final Cleaning -up <br />General Specifications Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.