My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(02-08-01) Sidewalk & Street Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 5:02:56 AM
Creation date
1/5/2011 9:08:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sidewalk & Street Improv.
Bid No. (xx-xx-xx)
02-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City of Sunny Isles Beach will not be liable for any delay or added expense the <br />Contractor experiences due to the activities of utility companies, nor shall the City be <br />held responsible for any damages to any utilities due to any actions by the Contractor. <br />Note: the Contractor shall contact the Underground Notification Center (1- 800 -432- <br />4770) and the Underground Notification for Florida Power and Light Company (789- <br />2020) at least forty -eight (48) hours prior to commencing any trenching for excavation on <br />this project. These telephone numbers are for reference only, it is the contractor's <br />responsibility to verify them and make the necessary contacts with the utility companies <br />prior to commencing his work. <br />11. Pre - Construction Conference: <br />Page 74, Section 8 -3.5 — PRECONSTRUCITON CONFERENCE: This sub article is <br />expanded to include: <br />After the Award of Contract and prior to the issuance of the "Notice to Proceed ", a Pre - <br />Construction Conference will be held with the Contractor, members of the City's Public <br />Works Department and other Metropolitan Dade County Agencies, representatives of <br />Utility Companies, and other contractors affected by the work. The time and place of this <br />conference will be set by City Manager. <br />12. Contingency Fund: <br />Item No. 999 "Contingency Fund" has been included in the Bid Form. <br />The Contractor shall insert an amount equal to 10% of the Base Bid. The Contingency <br />Fund shall be used by the City to reimburse the Contractor for documented permit fees <br />that he may incur. It also may be utilized by the City for unforeseen conditions that may <br />occur during the construction. <br />13. Award of Contract and Time for Completion: <br />The Contract Award shall be to the qualified bidder whose proposal complies with all the <br />requirements necessary to render it formal. <br />14. Maintenance of Traffic (Section 102) <br />Page 104, Section 102 -1.1- DESCRIPTION: This sub article is amended to include: <br />The applicable portions of the Metropolitan Dade County Public Works Manual, Part 1, <br />Standard Details, as pertain to the maintenance of traffic, are part of these Contract <br />Documents. Traffic control notes and details pertaining to the Maintenance of Traffic <br />(Traffic Control) are included in the Plans for this Project. <br />Special Provisions Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.