Laserfiche WebLink
meet specified limits, Contractor shall rework, re- compact, and retest failed areas as follows: <br />High Moisture Content: <br />Should moisture content exceed established maximum moisture content, Contractor shall spread, <br />disk, aerate, and / or otherwise cause the moisture content to be reduced to within uniform <br />maximum allowable limits. <br />Low Moisture Content: <br />Should moisture content not reach established minimum moisture content, Contractor shall disk, <br />sprinkler, water, mix, and /or otherwise bring the moisture content to within uniform minimum <br />allowable limits. <br />3.06COMPACTION <br />Contractor shall compact and / or otherwise manipulate each layer of fill using a vibratory compactor <br />such that a uniform compaction of not less than 100% of maximum dry density, per AASHTO T -99. <br />Where compaction fails to meet specified Iimits, Contractor shall rework, re- compact, and retest failed <br />areas. <br />3.07FIELD QUALITY CONTROL <br />Provide passing density / moisture tests in accordance with Section 01452, testing schedule. <br />END OF SECTION <br />02319-2 <br />