Laserfiche WebLink
conformance with ASTM C936 -82. <br />2.03 MATERIAL FOR BASE and EDGE BAND <br />1. Road Base <br />In accordance with: <br />1. Stabilized Subgrade Section 02722 <br />2. Limerock Base Section 02725 <br />2. Concrete Edge Band <br />In accordance with: <br />1. Section 02774 Portland Cement Concrete Curb and Gutter <br />3. Laying Course Sand: <br />Fine aggregate shall be clean, hard sand with durable particles and free from adherent coatings, <br />lumps of clay, alkali salts and organic matter. <br />PART 3 - EXECUTION <br />3.01 ROAD BASE AND EDGE BAND INSTALLATION <br />1. Road Base <br />Install in accordance with: <br />1. Stabilized Subgrade Section 02722 <br />2. Limerock Base Section 02725 <br />2. Concrete Edge Band <br />In accordance with: <br />1. Section 02774 Portland Cement Concrete Curb and Gutter <br />3.02 SETTING BED INSTALLATION <br />1. Place laying course, compact and screed to a minimum thickness of 1/2 ". <br />2. Set interlocking concrete turf blocks hand tight, being careful not to disturb leveling base. Use <br />string lines to keep straight lines. Use block splitter to cut edges ,when full -size units cannot be <br />used. <br />3. Fill apertures with approved top soil and seed. <br />END OF SECTION <br />02784-2 <br />