Laserfiche WebLink
5.4 CASTING: <br />A. <br />Q <br />C. <br />Tie rods shall be encased in 2" diameter PVC pipe. <br />The PVC pipe shall be embedded in the cap a minimum of 3 ". <br />The PVC shall be continuous and shall not have any seams or breaks. <br />6.0 GEOTEXTILE CLOTH <br />6.1 MATERIAL: <br />A. The geotextile cloth shall be Mirafi 70OX or as approved by the <br />ENGINEER. <br />B. The substitution shall be approved in writing by the ENGINEER. <br />6.2 INSTALLATION: <br />A. Geotextile Cloth Placement - The seams of the filter fabric shall overlap a <br />minimum of 24 inches or shall be bonded by cementing or heating. During <br />periods of storage , the plastic filter fabric shall be protected against direct <br />sunlight, ultraviolet rays, temperatures greater than 140 F, dirt, mud and <br />debris. <br />B. The geotextile fabric shall be placed in the manner and locations shown <br />in the Drawings. At the time of installation, fabric shall be free of all holes, <br />rips and flaws. The surface to receive the fabric shall be of relatively <br />smooth grade and condition, free of obstructions, debris and depressions. <br />The fabric shall be placed to provide a minimum of 24 inches overlap for <br />each joint and shall be laid smooth, free of folds and creases. <br />TS -25 <br />RJG10W03MNNY ISLESMECHSPECS <br />