My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Construction material waste, debris, organic material and unsuitable fill <br />material excavated from required on -site excavations shall be removed from <br />the site. Location of dumps and length of haul shall be the responsibility of <br />CONTRACTOR. Disposal to be in COUNTY approved dump site. <br />2.8 CONTROL OF WATER: <br />A. At all times during work until completion and final acceptance, ample means <br />and equipment shall be provided with which to remove promptly and dispose <br />of properly all standing water that would interfere with the Work. <br />B. Water pumped or drained from the Work shall be disposed of in a suitable <br />manner without damage to adjacent property. Water shall not be discharged <br />onto streets. <br />C. Any and all water damage shall be promptly repaired by CONTRACTOR at <br />his expense. <br />2.9 SHORING AND SHEETING: <br />A. Excavations shall be shored, sheeted and braced as necessary to <br />accomplish the work in a safe efficient manner and/or to protect existing <br />construction. Construction of shoring shall be in accordance with all <br />applicable federal, state, and local regulatory agency requirements. <br />CONTRACTOR shall be responsible for all damage to persons or property <br />resulting from the omission of necessary shoring, sheeting and bracing. <br />B. Sheeting and bracing shall be removed as the excavation is refilled in such a <br />manner as to avoid caving in the bank or disturbance to adjacent areas or <br />structures. The voids left by removal of the sheeting shall be carefully filled <br />by ramming or as otherwise approved by ENGINEER. <br />RJCJ aMSUNNY ISLESJTECNSPECS <br />TS -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.