My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br />I <br />1 <br />CITY OF SUNNY ISLES BEACH <br />Bid No.- 01-09-01 <br />Page No. 18 <br />PARKS /NIEDIANS/RIGHT -OF -WAY MAINTENANCE <br />SPECIFICATIONS <br />* A two -way communication system between all of the contractors <br />service vehicles and their main office <br />* Locator equipment capable of locating underground irrigation wires. <br />* One dump truck with a minimum of 15,000 pound gross vehicle <br />weight with a chipper box, and equipped with flasher bar. <br />* One FDOT approved traffic arrow board and required quantity of <br />orange safety cones. <br />C. SATELLITE STORAGE AND MOBILIZATION FACILITY <br />1. The contractor must operate at least one dedicated storage and mobilization site within three <br />miles of the City of Sunny Isles Beach, within 60 days of award, as follows: <br />A. The storage site may be totally enclosed or may be open and surrounded by a six foot <br />height, lockable, chain -link fence. <br />B. The storage site must have a minimum of 1000 sq. ft. area, with a minimum 240 sq. <br />ft. of fully enclosed, lockable, and secure materials storage area, and must be <br />continually available to the contractor for the full duration of this contract. The City <br />reserves the right to inspect this facility prior to award of bid, and at any time during <br />the course of this contract. The contractor will have 60 days to secure the storage <br />site after award of contract. <br />D. SCOPE OF WORK + <br />1. Contractor shall maintain the contractually covered landscaped areas at the frequency rate <br />prescribed with conventional production style mowing and lawn maintenance and equipment. <br />2. Contractor shall maintain all other areas as required by City during the course of this contract. <br />E. PROFESSIONAL ORGANIZATIONS <br />1. The contractor, as a minimum, must be a member, in good standing, of the following <br />' organizations: <br />A. Florida Nurserymen & Growers Association (FNGA) <br />B. National Arborist Association (NAA) <br />1 2. The Contractor shall provide proof of membership with the bid submittal. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.