My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />PARKS /MEDIANS/RIGHT -OF -WAY MAINTENANCE <br />SPECIFICATIONS <br />G. DEFINITIONS <br />Bid No. 01 -09 -01 <br />Page No. 19 <br />1. If the Contractor intends to use sub - contractors to perform any work on this contract, these sub- <br />contractors are subject to approval by City. <br />2. Maintenance as defined for bid purposes shall include: Litter, trash, and debris removal and <br />disposal; mowing; edging; hedge trimming; selective tree trimming; raking; sweeping; weeding, <br />weedeating, herbicide applications, fertilization, insect control, irrigation system adjustment and <br />repair, and Date Palm and Coconut Palm maintenance. <br />H. SPECIAL CONTRACT REQUIREMENTS <br />1. The President/Chief Operating Officer of the contracting firm must be available to attend <br />meetings with the City and/or it's designee within 24 hours of notification. <br />2. For purposes of communicating the City's requirements, an English speaking superintendent <br />must be available at all times when work is being accomplished. <br />3. All of the contractor's employees must wear bright orange shirts that identify the company name, <br />at all times. <br />4. Maintenance of traffic must conform to the current edition of the Florida Department of <br />Transportation (FDOT) Roadway and Traffic Design Standards Indexes (600 Series), the Standard <br />Specifications for Road and Bridge Construction and the Manuals on Uniform Traffic Control <br />Devices, as a minimum criteria.. <br />5. The contractor, or an employee of the contractor approved by the City, must be on 24 hour <br />call, at all times, for emergency purposes. <br />6. The contractor, on an immediate and first priority basis, shall be available to the City to clear <br />roadways or access areas in the event of an Act of God (ie. storm, tornado, or hurricane) or an <br />auto accident that causes a tree to fall and block a roadway or pedestrian area, or any other <br />emergency deemed by the City Manager. <br />7. The contractor shall be available to meet with all public utilities to locate all irrigation and <br />hydraulic lines prior to excavation by the utility company. The contractor is to act as the City's <br />
The URL can be used to link to this page
Your browser does not support the video tag.