My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />Bid No. 01 -09 -01 <br />Page No. 21 <br />PARKS/MEDIANS/RIGHT -OF- WAY MAINTENANCE <br />SPECIFICATIONS <br />' 35 - 1/2 Male Pipe Thread x 3/8 x 3/8 Tees <br />20 - 1/2 Male Pipe Thread x 3x8 Adapter <br />1 - Rainbird Unik Field Transmitter (to check/set controllers) <br />I. REQUIREMENTS FOR EXISTING IRRIGATION SYSTEM ON COLLINS AVENUE <br />MEDIAN <br />1. The Collins Avenue median is irrigated through a `Wethose' subsurface irrigation system <br />supplied by City water meters. <br />2. Required on -going maintenance as follows: <br />A. Monthly - Turn system on with controllers and check program. Adjust program <br />as needed for seasons, new plantings, and weather conditions. Verify that system <br />is running 20 minutes on and 20 minutes off, per cycle, to prevent `Wethose' <br />hydration (decrease leak rate). Suggested frequency of watering (will vary based <br />on rainfall) is 5 cycles per day 5 days per week during dry season and 4 cycles per <br />day 3 days per week during the wet season. Visually inspect valves, filters, and <br />backflow preventers for malfunction or damage and repair as needed. With <br />system running, visually inspect for PVC pipe breaks or `Wethose' needing <br />repairs. Always make repairs to all PVC or `Wethose' pipe after flushing the <br />pipe. After repairs are complete, turn the system on to verify that no additional <br />work is required. <br />B. Quarterly - In addition to monthly maintenance schedule, open flush ports and let <br />water run a minimum of 3 minutes. Check filter elements for excess residual and <br />replace if needed. <br />C. Annually - In addition to monthly maintenance schedule, replace filter elements <br />and controller batteries. Chemically flush system using `Disolve' (this process <br />will remove iron, calcium, and other buildup on the inside of the Wethose and <br />PVC pipe). <br />D. Accidental Damage to System - Follow the monthly procedure and be mindful to <br />always flush the system before and after making repairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.