My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
density acceptable at any location along the traveled roadway shall be ninety -eight (98) percent of <br />such maximum density. The minimum percent of carbonates of calcium and magnesium in the <br />Limerock Material will be fifty (50). <br />After spreading of the first lift is completed, the entire surface shall be scarified and shaped so as to <br />produce the required grade and cross section after compaction. Prior to placing the second lift, the <br />first course shall be cleaned of all foreign material and blade and brought to a surface cross section <br />approximately parallel to that of the proposed finished base. Prior to spreading of any material for <br />the upper course, the density tests for the lower course shall be made and the Engineer shall have <br />determined that the required compaction has been obtained. <br />After the spreading of the material for the second course is completed, its surface shall be finished <br />and shaped so as to produce the designed grade and cross section after compaction, and free of scabs <br />and lamination. <br />a. At the option of the Engineer, unless the use of forms is specifically called for in the Plans, the <br />base may be constructed six (6) inches wider in lieu of using forms. These extra widths will not be <br />measured for payment and shall be provided at no additional expense to the City. <br />b. Upon the Engineer's approval of the Limerock Base, it shall be primed with a prime coat having a <br />minimum curing period of forty eight (48)- hours. <br />c. Under no circumstances will the Engineer allow the prepared base to remain un- surfaced pending <br />completion of other Work remaining on the Project. <br />1 d. The quantity of Limerock Base, determined as provided in this Section, shall be paid for at the <br />Contract Unit Price Bid as indicated in the Bid Form of the Proposal. Such price and payment shall <br />be full compensation for all the work specified for the complete construction of the base course as <br />specified herein, including the necessary preparation and compaction of the sub - grade, correcting all <br />defective surfaces of the sub -grade and/or deficient thickness and priming of the base course. <br />Note: The areas of base course to be measured for payment shall include the areas of extra base <br />required at various intersections. The cost of replacing base materials removed only for the <br />construction of underground items shall be included in the Bid Price for the various items. <br />26. Prime and Tack Coats for Base Courses (Section 300) <br />Section 300 -7.1 - GENERAL: This article is expanded to include the following: <br />A Prime Coat is required for all Limerock Base Construction and the cost will be included in the Unit <br />Price Bid for Limerock Base per cubic yard as noted in the Bid Form of the Proposal. No separate <br />payment shall be made for the Prime Coat or its application. <br />27. Bituminous Material- Payment Adiustment (Item 300 -1 -999) <br />Section 9 -2.1 - ITEMS INCLUDED IN PAYMENT: This sub - article is expanded as follows: <br />The bid unit price for bituminous materials (asphalt concrete, prime and tack coat) will be adjusted to <br />reflect changes, both increase and decrease, in the asphalt price index, based on the average of the <br />current bituminous materials prices at Port Everglades, from that in effect during the month in which <br />ISpecial Provisions 09/24 Page 9 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.