My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Leg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Miller Leg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 8:39:00 AM
Creation date
1/19/2011 4:01:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Svcs.
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />All proposed hardscaping, such as pavers, and site furnishings will be shown and <br />' detailed on the drawings. For a growing City like Sunny Isles Beach, the <br />hardscape treatments and amenities such as bus shelters, benches, and lighting <br />are an important component to the streetscape. The selection of site furnishings <br />' and lighting will be a collaborative effort with City staff to maintain quality <br />standards. <br />ITask 3: Irrigation Design <br />To ensure the longevity of the streetscape enhancements, Miller Legg will <br />develop irrigation construction documents. This design will provide the <br />necessary irrigation water requirements to sustain plant material within the right - <br />of -way described in Task 2. The water source for irrigation systems designed by <br />Miller Legg for streetscape projects has included <br />wells, potable water, and canals adjacent to the <br />project site. Should non - potable water be the <br />source, Miller Legg has experience in the <br />development of pump stations to withdraw water <br />from wells or canals and deliver it to the landscape <br />areas. Water use permitting through the SFWMD <br />and coordination with the local drainage district <br />would then be carried out by Miller Legg for the <br />pump stations. The irrigation construction <br />documents will include all required irrigation <br />materials, details, specifications, and notes for the <br />irrigation installation. <br />Task 4: Status Meetings <br />The Miller Legg staff will conduct regular status meetings with the City during the <br />design process. These meetings will include coordination with the City Project <br />Manager, engineering staff and maintenance personnel. This coordination will <br />be critical to get "buy in" from the City to ensure the long -term success of the <br />project. <br />Task 5: Cost Estimates <br />Cost estimates for the proposed landscaping and irrigation improvements will be <br />prepared and submitted during the 50% and 100% submittals. <br />ITask 6: Bidding Assistance / Contract Administration <br />' Upon completion of the construction documents the project AutoCAD files can be <br />provided to the City in a variety of formats. These formats include email, <br />diskette, or CD. Miller Legg's full - service CAD production staff will provide the <br />' files to the City in the desired format. <br />\ X <br />\>000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.