My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />�J <br />J <br />1 <br />1 <br />SECTION 01030 <br />SPECIAL PROJECT PROCEDURES <br />PART 1 - GENERAL <br />1.01 OBSTRUCTIONS <br />A. The attention of the Contractor is drawn to the fact that during construction <br />at the Project site the possibility exists of the Contractor encountering water, <br />sewer, petroleum, gas, telephone, electrical, or other lines not shown on the <br />Drawings. The Contractor shall exercise extreme care before and during <br />construction to locate and flag these lines so as to avoid damage to the <br />existing lines. Should damage occur to an existing line, the Contractor shall <br />repair the line at no cost to the Owner. <br />1.02 PROVISIONS FOR THE CONTROL OF DUST <br />A. Sufficient precautions shall be taken during construction to minimize the <br />amount of dust created. Wetting down the site may be required or as <br />directed by the Engineer to prevent dust as a result of vehicular traffic. <br />1.03 RELOCATIONS <br />A. The Contractor shall be responsible for the relocation of structures, <br />including but not limited to light poles, signs, sign poles, fences, piping, <br />conduits and drains that interfere with the positioning of the work as set out <br />on the Drawings. The cost of all such relocations shall be included in the <br />bid for the project and shall not result in any additional cost to the Owner. <br />1.04 WARRANTIES <br />A. All equipment supplied under these Specifications shall be warranted by the <br />Contractor and the equipment manufacturers for a period of one (1) year. <br />Warranty period shall commence on the date of Owner acceptance. <br />B. The equipment shall be warranted to be free from defects in workmanship, <br />' design and materials. If any part of the equipment should fail during the <br />warranty period, it shall be replaced in the machine(s) and the unit(s) <br />restored to service at no expense to the Owner. <br />C. The manufacturer's warranty period shall run concurrently with the <br />Contractor's warranty or guarantee period. No exception to this provision <br />shall be allowed. <br />' 06/06 <br />01030 -1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.