My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />1 <br />1 <br />H. Protection After Installation: <br />1. Provide substantial coverings as necessary to protect installed <br />products from damage from traffic and subsequent construction <br />operations. Remove covering when no longer needed. <br />The Contractor shall be responsible for all materials, equipment, and <br />supplies sold and delivered to the Owner under this Contract until final <br />inspection of the work and acceptance thereof by the Owner. In the event <br />any such material, equipment, and supplies are lost, stolen, damaged, or <br />destroyed prior to final inspection and acceptance, the Contractor shall <br />replace same without additional cost to the Owner. <br />J. Should the Contractor fail to take proper action on storage and handling of <br />equipment supplied under this Contract within seven days after written <br />notice to do so has been given, the Owner retains the right to correct all <br />deficiencies noted in previously transmitted written notice and debit the <br />cost associated with these corrections from the Contractor's Contract. <br />These costs may be comprised of expenditures for labor, equipment <br />usage, administrative, clerical, engineering and any other costs <br />associated with making the necessary corrections. <br />1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />� a6/06 <br />A. Products List: <br />1. Within 30 days after the effective date of the Agreement, submit to <br />the Engineer a complete list of major products proposed to be <br />used, with the name of the manufacturer and the installing <br />subcontractor. <br />B. Contractor's Options: <br />1. For Products specified only by reference standard, select any <br />product meeting that standard. <br />2. For Products specified by naming several products or <br />manufacturers, select any one of the products or manufacturers <br />named, which complies with the specifications. <br />3. For products specified by naming one or more Products or <br />manufacturers and "or equal ", Contractor must submit a request as <br />for substitutions for any Product or manufacturer not specifically <br />named. <br />01600 -5 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.