C. Substitutions: <br />1. For a period of 30 days after the effective date of the Agreement, <br />the Engineer will consider written requests from Contractor for <br />substitution of Products. <br />2. Submit a separate request for each Product, supported with <br />complete data, with drawings and samples as appropriate, <br />including: <br />a. Comparison of the qualities of the proposed substitution with <br />that specified <br />l b. Changes required in other elements of the work because of <br />the substitution <br />C. Effect on the construction schedule <br />' d. Cost data comparing the proposed substitution with the <br />Product specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of <br />replacement materials <br />3. The Engineer shall be the judge of the acceptability of the <br />proposed substitution. <br />4. No substitutions will be considered by the Engineer after 30 days <br />from the Contract Date. <br />06/06 01600-6 1600 6 03 -4138. C <br />D. Contractor's Representation: <br />1. A request for a substitution constitutes a representation that <br />Contractor: <br />a. Has investigated the proposed Product and determined that <br />it is equal to or superior in all respects to that specified <br />b. Will provide the same warranties or bonds for the <br />substitution as for the Product specified <br />C. Will coordinate the installation of an accepted substitution <br />into the Work, and make such other changes as may be <br />required to make the Work complete in all respects <br />' <br />d. Waives all claims for additional costs, under his <br />responsibility, which may subsequently become apparent. <br />E. The Engineer will review requests for substitutions with reasonable <br />promptness, and notify Contractor, in writing, of the decision to accept or <br />reject the requested substitution. <br />06/06 01600-6 1600 6 03 -4138. C <br />