My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3500 <br />4000 <br />*Maximum; decrease <br />of mixing, including <br />solution. <br />6.4 <br />5.85 <br />5.64 <br />5.64 <br />if possible. This represents total water in mix at time <br />free water on aggregates, and water in admixture <br />* *Minimum; increase as necessary to meet other requirements. These <br />cement factors apply to "controlled" concrete subject to specific inspection. <br />D. When high - early- strength Portland cement is permitted, the same strength <br />requirements shall apply except that the indicated strengths shall be <br />attained at seven (7) days instead of twenty -eight (28) days. <br />E. If during the progress of the work it is impossible to secure concrete of the <br />required workability and strength with the materials being furnished, the <br />Engineer may order such changes in proportions or materials, or both, as <br />may be necessary to secure the desired properties. All changes so ordered <br />shall be made at the Contractor's expense. <br />F. If during the progress of the work the Contractor desires to use materials <br />other than those originally approved, or if the materials from the sources <br />originally approved change in characteristics, the Contractor shall, at his <br />own expense, have made new acceptance tests of aggregates and <br />establishment of new basic mixtures and submit them to the Engineer for <br />approval. <br />G. Consistency of the concrete as measured by the ASTM Designation C143 <br />shall be as shown in (Table B). <br />TABLE B <br />Portion of Structure <br />Slump (inches) <br />Max.* Min. <br />Pavement and slabs on ground 3 2 <br />Plain footings, gravity walls, <br />slabs and beams 3 2 <br />Heavy reinforced foundation <br />walls and footings 4 2 <br />Thin reinforced walls and columns 4 2 <br />* May be increased 1 -inch if proper method of consolidation is used. <br />H. Concrete shall be of such consistency and mix composition that it can be <br />readily worked into the corners and angles of the forms and around the <br />reinforcement, inserts, and wall castings without permitting materials to <br />segregate or free water to collect on the surface, due consideration being <br />given to the methods of placing and compacting. <br />No excessively wet concrete will be permitted, and if at any time concrete of <br />such consistency beyond the limits of Table B is delivered to the job, the <br />Engineer may direct the Contractor to reject same or to add extra cement <br />for which no additional payment will be made. A supply of the approved <br />cement shall be kept available at the site for this purpose. Drivers of <br />transit -mix trucks shall add no additional water except that established for <br />the design. Failure to comply with this requirement shall be justification for <br />rejecting the concrete. <br />03300 -3 03-4138. C <br />
The URL can be used to link to this page
Your browser does not support the video tag.