My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Demolish and completely remove from site existing underground <br />utilities indicated on the drawings to be removed. <br />C. Protection of Persons and Property: Barricade open excavations <br />' occurring as part of this work and post with warning lights. Operate <br />warning lights as recommended by authorities having jurisdiction. <br />1. Protect structures, utilities, sidewalks, pavements, and other <br />facilities from damage caused by settlement, lateral movement, <br />undermining, washout and other hazards created by earthwork <br />' operations. <br />1.05 TRENCH PROTECTION <br />' A. The Contractor shall construct and maintain sheeting and bracing as <br />required to support the sides of excavations, to prevent any movement <br />' <br />which could in any way diminish the width of the excavation below that <br />necessary for proper construction, and to protect adjacent structures, <br />existing piping and foundation material from disturbance, undermining, or <br />other damage. Care shall be taken to prevent voids outside of the <br />sheeting, but if voids are formed they shall be immediately filled and <br />compacted. <br />' <br />B. For pipe trench sheeting, no sheeting is to be withdrawn if driven below <br />mid - diameter of any pipe, and no wood sheeting shall be cut off at a level <br />lower than 1 foot above the top of any pipe unless otherwise directed by <br />the Engineer. If during the progress of the work the Engineer decides that <br />' <br />additional wood sheeting should be left in place, he may direct the <br />Contractor in writing. If steel sheeting is used for trench sheeting, removal <br />shall be as specified above, unless written approval is given by the <br />Engineer for an alternate method of removal. <br />C. All sheeting and bracing, not left in place, shall be carefully removed in <br />such a manner as not to endanger the construction or other structures, <br />utilities, existing piping, or property. All voids left or caused by withdrawal <br />of sheeting shall immediately be refilled with sand or ramming with tools <br />especially adapted to that purpose, by watering or otherwise as may be <br />directed. <br />D. The right of the Engineer to order sheeting and bracing left in place shall <br />not be construed as creating any obligation on his part to issue such <br />orders, and his failure to exercise his right to do so shall not relieve the <br />' Contractor from liability for damages to persons or property occurring from <br />or upon the work occasioned by negligence or otherwise, growing out of a <br />failure on the part of the Contractor to leave in place sufficient sheeting <br />' 07/06 02221 -2 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.