Laserfiche WebLink
SECTION 02481 <br />SHRUB AND TREE RELOCATION <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. Provide all labor, materials, necessary equipment and services to <br />complete the Fine Grading work, as indicated on the drawings, as <br />specified herein or both, except as for items specifically indicated as "NIC <br />ITEMS ". <br />A. Plant materials to be relocated on site are designated on the drawings or <br />as directed by the Landscape Architect. <br />B. The Contractor's crew utilized for the relocation of existing trees and <br />shrubs shall have minimum five years experience in relocation of existing <br />plant materials and be recognized by the American Association of <br />Nurserymen. <br />C. Existing trees to remain shall be protected during all construction phases <br />as noted on demolition plan. Any trees or shrubs scarred or destroyed <br />1 designated to remain will be replaced at the Contractor's expense, with <br />similar species, size and quality. <br />D. Remove other trees, saplings, shrubs, bushes, vines and undergrowth as <br />necessary and as directed by the Landscape Architect to accommodate <br />new plantings. Prepare areas to be planted per Specification Sections <br />02484, 02487, and 02490. <br />E. Resulting tree pits and shrub bed pits of relocated material shall be <br />backfilled with clean fill and brought back flush with surrounding grade if <br />required. It shall be the contractor's responsibility to correct problems <br />caused by erosion, wind, etc., in the reclaimed area where he has dug. <br />F. In areas where new plant material will replace relocated plant material, <br />appropriate planting soil mix shall be used as backfill. <br />t <br />1 07/06 02481 -1 05 -5564 <br />1.02 RELATED WORK <br />A. Section 02484 <br />- Soil Preparation and Soil Mixes <br />' <br />C. Section 02487 <br />- Sodding <br />D. Section 02490 <br />- Trees, Plants, and Groundcover <br />1.03 DESCRIPTION <br />A. Plant materials to be relocated on site are designated on the drawings or <br />as directed by the Landscape Architect. <br />B. The Contractor's crew utilized for the relocation of existing trees and <br />shrubs shall have minimum five years experience in relocation of existing <br />plant materials and be recognized by the American Association of <br />Nurserymen. <br />C. Existing trees to remain shall be protected during all construction phases <br />as noted on demolition plan. Any trees or shrubs scarred or destroyed <br />1 designated to remain will be replaced at the Contractor's expense, with <br />similar species, size and quality. <br />D. Remove other trees, saplings, shrubs, bushes, vines and undergrowth as <br />necessary and as directed by the Landscape Architect to accommodate <br />new plantings. Prepare areas to be planted per Specification Sections <br />02484, 02487, and 02490. <br />E. Resulting tree pits and shrub bed pits of relocated material shall be <br />backfilled with clean fill and brought back flush with surrounding grade if <br />required. It shall be the contractor's responsibility to correct problems <br />caused by erosion, wind, etc., in the reclaimed area where he has dug. <br />F. In areas where new plant material will replace relocated plant material, <br />appropriate planting soil mix shall be used as backfill. <br />t <br />1 07/06 02481 -1 05 -5564 <br />