Laserfiche WebLink
I• <br />• <br />• <br />• <br />Calvin, i r <br />Design of the Fourth (4th) Runway, Miami International Airport, Florida. Functional Project Manager for the <br />design of the 4th Runway which involved extensive modifications to the master drainage permit, utility relocations, <br />pump station designs, maintenance of traffic, and complex phasing. Duties included the writing of specifications, <br />special provisions, construction notes, and other contract documents, as well as the development of details, plans, <br />and profiles. <br />Roadway Design Experience <br />Andrews Avenue, Florida Department of Transportation, District 4, Broward County, Florida. Project <br />Engineer for reevaluation and design of roadway improvements including drainage problems. Completed plans for <br />turn lanes, pavement milling, and drainage revisions to alleviate flooding to adjacent properties. <br />Grade Separation Study for SR714, Dixie Highway, and FEC Railroad, Florida Department of <br />Transportation, District 4, Broward County, Florida. Project Engineer for evaluation of several roadway <br />separation designs for Dixie Highway and SR -714. The study consisted of preliminary design, cost estimates, and <br />exhibits for Public Hearings by FDOT. Project included Bridges, elevated ramps, signalization, pavement markings, <br />drainage, and pavement design. <br />Venetian Causeway, Florida Department of Transportation, District 6, Miami, Florida. Project Engineer <br />responsible for the alignment and design of the Venetian Causeway bypass bridge, which included several phases of <br />maintenance to traffic, signalization, milling, resurfacing, drainage, pavement markings, signage, permitting, and <br />utilities. <br />Biscayne Boulevard Florida Department of Transportation, District 6, Miami, Florida. Project Engineer <br />analyzing utility relocation, lighting, paving, grading, and drainage requirements. Represented FDOT for <br />condemnation and assessed proposed Right -of -Way acquisitions of commercial properties to establish values. <br />Cypress Creek Maintenance of Traffic Plan, Broward County, Florida. Project Engineer for design of <br />roadway widening, turn lanes, signalization, pavement milling, and utility relocation. Developed a Maintenance of <br />Traffic plan for the high traffic artery with numerous abutting drives and large school. <br />McNab Road, Broward County, Florida. Project Engineer for design of roadway improvements and drainage. <br />Completed plans for turn lanes, pavement milling, and drainage improvements to serve adjacent commercial <br />properties. <br />Pine Island Road. Project Engineer for roadway improvements and drainage design. Completed plans for <br />widening, turn lanes, pavement milling, pavement design, and drainage improvements. Coordinated signalization, <br />access, and landscaping. <br />Bell Glades County: Roadway Design and Construction. Project Engineer responsible for the design and <br />construction services for 1.2 miles of roadway, which included drainage, pavement design, turn lanes, signage, <br />pavement markings, and utilities. <br />Okeechobee County: Wolff Roadway Design. Project Engineer for the design of roadway widening, <br />intersections, access drives, pavement design for milling and resurfacing, signage, permitting, pavement markings, <br />and signalization. Coordination of Landscaping and City concerns with adjacent properties. <br />Miami International Airport, Miami -Dade County, Florida. Project Engineer for the redesign of two FDOT <br />intersections on NW 3611 Street, which included shift alignment, signalization, pavement markings, milling, <br />resurfacing, drainage, and maintenance of traffic. <br />• Palm Beach International Airport, Palm Beach County, Florida. Project Manager responsible for the civil <br />• engineering and construction services for the terminal parking garage expansion. Designs include the geometry, <br />• alignment, and matching of several roadways by means of milling and resurfacing. Services included drainage and <br />utility modification as well as coordination of site lighting and landscaping. <br />• <br />• <br />