My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Calvin Giordano & Assoc.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:15:21 AM
Creation date
1/24/2011 3:18:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Associates, <br />Oakhill Neighborhood Traffic Intrusion and Neighborhood Traffic Management Study, Davie, <br />Florida. Performed a comprehensive traffic evaluation for the Oakhill residential neighborhood. Study evaluated <br />vehicular speed, volume, and cut - through traffic patterns for traffic calming or other traffic management <br />measures. The Town also requested traffic calming recommendations that would reflect the area's equestrian <br />lifestyle. Recommended isolating the internal streets from cut - through traffic through street closure, diverter or <br />semi- diverter treatments, and addressed the collector roadways by implementing a modified configuration to <br />include narrowed travel lanes, curbed median with ground cover, bike lanes and /or equestrian trails with edge <br />treatment to give the psychological feeling of a restricted roadside. Recommendations were extremely well <br />received by residents and the plan is being implemented. <br />0 ArvidaParkway/I -75 Traffic Study and Interchange Operations Analysis Report (IOAR), Weston, <br />• Florida. The southbound exit ramp from 1 -75 to westbound Arvida Parkway is a free -flow ramp experiencing ex- <br />cessive delay during peak hours. Further, a unique weaving situation developed due to lane geometry and <br />alignment coupled with explosive population growth downstream of the ramp junction. Evaluated alternatives to <br />• cost - effectively solve ramp's operational problem as well as downstream bottlenecking. Phase I identified ways <br />• to minimize weaving and delay while Phase 11 will monitor and address potential problems at the ramp junction <br />with 1 -75. <br />• Parking and Traffic Study, Lantana, Florida. Recent redevelopment inquiries spurred the Town to analyze <br />existing and future parking supply /demand, as well as the efficiency of traffic flow within the downtown area, <br />• which spans from the Intracoastal Waterway to Broadway Avenue and includes US 1 and Lantana Road. Study <br />was based on the Town's Visioning Process that included mixed -use development along Ocean Avenue. <br />Identified parking supply deficiencies and recommended alternative mode transportation strategies to minimize <br />• traffic impacts associated with future redevelopment, particularly along the Ocean Avenue corridor where land- <br />scaped islands and other aesthetic improvements restricted traditional capacity improvements. <br />MacArthur Boulevard /SR -A1 A Roundabout Justification Study, Martin County, Florida. A traffic <br />operations study determined the appropriate future traffic control for the intersection of MacArthur Boulevard and <br />SR -A1 A. The intersection was controlled by a traffic signal but the Justification Study indicated that future opera- <br />tions would be best served by a roundabout rather than a stop - controlled condition or the current signalization <br />• method. <br />• Hurricane Evacuation Study, Marathon, Florida. Recent analysis indicated that in the event of a Category 3 <br />or greater hurricane, the Florida Keys would require more than 26 hours to completely evacuate, exceeding the <br />State - mandated 24 -hour maximum. As a result, the City commissioned CGA to identify measures to reduce <br />• clearance times for the City's residents. Determined that the City's transient population and evacuees towing <br />boats or driving large vehicles /motor homes were good candidates for early evacuation. The premise was to <br />provide a head start to remove slow- moving vehicles from the general traffic stream. This would improve <br />• clearance times for the City and County. Analysis indicated that this method could save as much as one hour in <br />total clearance time to evacuate the entire population of the Florida Keys. <br />• SR -A1 A/Hillsboro Boulevard Community Redevelopment Agency (CRA) Study, Deerfield Beach, <br />Florida. The CRA was formed to create a long -range redevelopment plan for areas identified as not realizing <br />their full economic potential. Study focused on transportation issues surrounding the redevelopment near the <br />• intersection of SR -A1A /Hillsboro Boulevard. The unique geometry of the "S" curve located north of the <br />intersection, along with the high pedestrian use, precipitated realignment alternatives to improve vehicular and <br />pedestrian safety. <br />"Group 1 - 1999" Traffic Signal Installations (Design and Construction), Weston, Florida. Performed <br />traffic signal warrant studies, produced traffic signal construction plans, and prepared construction specifications <br />• and bid documents for installation of four mast -arm traffic signals serving the Weston Park of Commerce. <br />Construction plans reflected FDOT and Broward County Traffic Engineering standards for a special mast - <br />arm /luminaire combination specifically developed by Arvida Corporation. Construction plans incorporated video <br />• vehicle detection, internally illuminated street signs, upgraded ADA- compliant sidewalk connections, and brick - <br />paver crosswalk installations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.