My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marlin Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-03-01) General Engineering Services
>
Responses
>
Marlin Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 11:56:29 AM
Creation date
1/27/2011 11:55:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Engineering Svcs
Bid No. (xx-xx-xx)
07-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />I <br />. <br />I <br /> <br />. <br />I <br />. <br />. <br />. <br /> <br />. <br />. <br /> <br />. <br />. <br />I <br />. <br />I <br />tp <br />. <br />I <br />. <br />. <br /> <br />I <br />. <br />. <br /> <br />tp <br />. <br />. <br />. <br />I <br />~ <br />. <br />. <br />. <br />I <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />~ <br />~ <br />~ <br />. <br />. <br />I <br />. <br />~ <br />I <br />~ <br />. <br />. <br />. <br />. <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />~ <br />. <br />. <br />. <br />. <br /> <br />SERGIO ALFONSO, JR., P.E. <br />Duality Control Officer <br /> <br />!~~. <br /> <br />Page 2 , <br /> <br />Roadway and signing & pavement marking, utility coordination, design and plan preparation for traffic <br />monitoring equipment, including sensors and its equipment for one PTMS site. <br /> <br />. SR 84 and Paradise Way, Broward County, FL. Quality Control Engineer, and was responsible for the <br />overall quality control of all design activities. This project encompassed the design of an exclusive right <br />turn lane, drainage, utility coordination, signing and pavement marking. <br /> <br />. SR 714 and Florida's Turnpike Entrance, Martin County, FL. Quality Control Engineer, and was <br />responsible for the overall quality control of all design activities. This project encompassed the design of <br />a milling and resurfacing, utility coordination, signing and pavement marking, signalization and lighting. <br /> <br />NW 25th Street, Final Roadway Design, Miami-Dade County, FL (2000-2006). Mr. Alfonso is the Quality <br />Control Engineer responsible for the overall quality control of all design activities. This is a two mile urban <br />arterial at grade, also including a direct viaduct connector between west of SR 826 and the Miami <br />International Airport West Cargo Area. Project Manager: Jason Chang, P.E. (305) 470-5331. <br /> <br />SR 826 Connector Ramp at Golden Glades Interchange, Miami-Dade County, FL (1998-2002). Mr. <br />Alfonso was the Quality Control Engineer, and was responsible for the overall quality control of all design <br />operations. His significant professional expertise contributed to the production of a high quality project by <br />reviewing all documents prior to each submittal, following specific procedures. Mr. Alfonso checked the <br />roadway design; signing and pavement marking plan for accuracy, adequacy, legibility and clarity of <br />presentation. His review comments were referred to project management for corrections or responses, to <br />integrate management and production efforts and obtain a quality final product satisfactory to FDOT. Project <br />Manager: Daniel Iglesias, P.E. (305) 470-5289 <br /> <br />SR 80 (Southern Blvd.) from West of Haverhi/l Road to Parker Avenue, Palm Beach County (1998- <br />2003). Quality Control Engineer, and was responsible for the overall quality control of design and plan <br />preparation activities. This project embraced four miles of roadway reconstruction for a major highway in <br />Palm Beach County, included lighting justification report, lighting design, signing and pavement marking. <br />Design and plan preparation for traffic monitoring equipment, including sensors and its equipment for one <br />PTMS site. Project Manager: John Thompson, P.E. (954) 777-4680 <br /> <br />SR 80 (Southern Blvd.) from 105th Avenue to Fairground Road, Palm Beach County, FL (1998-2003). <br />Quality Control Engineer, and was responsible for the overall quality control of design and plan preparation <br />activities. This project embraced four miles of roadway reconstruction for a major highway in Palm Beach <br />County, included lighting justification report, lighting design, and signalization. Project Manager: John <br />Thompson, P.E. (954) 777-4680 <br />
The URL can be used to link to this page
Your browser does not support the video tag.