Laserfiche WebLink
<br />. <br />. <br />tt <br />. <br />I <br />. <br />. <br />I <br />., <br />. <br />I <br />. <br />I <br /> <br />., <br />. <br />I <br />. <br />P <br />. <br />. <br />I <br />~ <br />~ <br />: <br />. <br />c <br />~ <br />~ <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />. <br />. <br /> <br />EDWIN F. MOJENA, M.S., P.E. <br />Project Manager <br /> <br />~~!!~I"'- <br /> <br />Page 2 ~, <br /> <br />Port of Miami Roads (2002 - 2004): Traffic Control Plans Engineer. Responsible for developing all Traffic <br />Control Plans for all construction sequences of the Design Build of the Port of Miami Improvements Plan. <br />Additional responsibilities included the design of all Signing and Pavement Markings pertinent with this <br />design. Contact: Bob Owens, P.E. (305) 347-4890. <br /> <br />SR 5/ US-1 Milling and Resurfacing (2002 - 2004): Deputy Project Manager. Responsible for design and <br />calculations of design analysis. Responsible for the overall geometric and vertical design, as well as plans <br />production submittal. (FOOT Dist IV, FT. Pierce). Contact: Robert Bostian, P.E. (954) 777-4427. <br /> <br />Sawgrass Expressway PD&E/ Final Design (1997 - 2000): Deputy Project Manager. Responsible for <br />design and calculations of preliminary drainage analysis. Responsible for the overall geometric and vertical <br />design, as well as plans production for 30% submittal. Plan production for 60%, and 90% submittals. <br />(Turnpike Authority). Contact: Becky Bolan, P.E. (407) 532-3399 ext. 3416. <br /> <br />West 24th Avenue (1997 - 1999): Deputy Project Manager. Design of horizontal and vertical geometry as <br />well as drainage design coordination. Responsible for overall plans production and Q/A with emphasis on <br />FDOT Design Standards. This project entailed reconstruction of an urban roadway from an existing 2-lane <br />facility to a five-lane roadway. Contact: Octavio Marin, P.E. (305) 375-2694. <br /> <br />SR-934 / Hialeah Expressway PD&E (1996 - 1999): Project Engineer in charge of plans production, which <br />included design of horizontal and vertical alternatives for the entire project, analysis of alternatives included <br />improvements to the exit/entrance ramps. Responsible for overall plans production, Traffic Control Plans, <br />design of cross-sections and DTM. Also in charge of coordinating and developing presentation for two <br />Public Information Meetings. FDOT District VI (12/96 to 5/98). Contact: Bill Evans, P.E. (305) 470-5100. <br /> <br />Military Trail (1996 - 2000): Project Engineer. Design of four intersection plateaus, including horizontal & <br />vertical alignments. Responsible for plans production with emphasis on Florida DOT Design Standards. <br />West Palm Beach FDOT District IV. (10/96). Contact: Jose Santiago, P.E. (305) 477-7575. <br />