Laserfiche WebLink
<br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br /> <br />. <br />. <br />. <br />. <br />I <br />. <br />I <br />. <br />. <br />I <br />. <br />I <br />. <br />. <br />. <br />I <br />. <br />I <br />. <br />I <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />., <br />. <br />. <br /> <br />. <br /> <br />. <br />I <br />. <br />I <br />. <br />. <br /> <br />. <br />I <br /> <br />, <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />I <br />I <br />- 1 <br /> <br />LOURDES ENCARNACION <br />Senior Project Engineer <br /> <br /> <br />Page 2 <br /> <br />New Miami International Airport Runway/Taxiway - Civil Engineer, Miami-Dade Aviation Department. <br />Responsible for scheduling and cost estimates. Expansion coordination of multi-task efforts, including <br />airfield lighting, maintenance of traffic, utilities, signing and pavement markings, drainage and grading. <br />Extensive use of Microstation/CADD/Geopak software, as well as Microsoft Office and engineering <br />programs to track design from concept through Cost Estimate. Well versed with various codes, rules, <br />regulations and laws as they pertain to airport design and construction. Familiar with agencies including <br />FAA, FDOT, SFWM, DERM and others. <br /> <br />Florida Department of Transportation, District 4. For Public Transportation Contract responsible for the <br />CEI Services for FECRR and CSXTRR crossings rehabilitation of railroad and roadway projects. Duties <br />included overall supervision and inspection of all work performed by the contractors and railroad forces. <br />Included paving of railroad grade crossings, complete documentation of the trackwork, check of contractor <br />claims and verifying invoices. Responsible for Rail-Highway Inventory for various FECRR and CSXTRR <br />crossings in five counties. Responsibilities included field supervision of project, conducting field inspection <br />and documentation for each crossing in the counties, data collection and data input into FDOT mainframe. <br /> <br />SR B09/Military Trail PD&E Study, SR 5/US 1 Jewfish Creek Bridge. Multimodal Facility and Metrorail <br />Extension PD& E Study and 1-95/1-595 Multimodal Transportation Corridor Master. Responsible for <br />geometric design alignment utilizing GEOPAK/CADD system, preparing profiles, cross sections, super <br />elevation design and signing and markings for various projects for the Florida Department of Transportation. <br /> <br />Route 32- Turpentine Run/Red Hook Road in St. Thomas, U.S. Virgin Islands Department of Public <br />Works. Responsible for the design of USVI which includes geometric horizontal and vertical alignment for <br />various phases of the project. <br /> <br />David Plummer & Associates, Coral Gables, Florida <br />1992 -1993 <br /> <br />Project Highway Engineer <br /> <br />SR 7 at North New River Canal-Stabilization Bank, Opa Locka Airport Project (Hoxey Road, High <br />Mast Arm Lighting, Static Ground Rods), Palmetto Expressway (signing & marking design), US 1. <br />Responsible for the design of minor roadway projects throughout the firm. Specific tasks related to these <br />efforts included conducting field work, roadway geometric alignment design, utilities coordination, drainage <br />structure design, signing and marking design, lighting design, traffic signalization design, traffic control <br />design and final cost <br /> <br />Ludovici & Orange, Inc., Coral Gables, Florida <br />1990 - 1992 <br /> <br />Project Highway Engineer <br /> <br />Miami Dade County Public Works (DCPW. Responsibilities included project scheduling, as well as <br />technical specifications and technical personnel supervision. Prepared design plans for roadway <br />improvement and reconstruction projects, which included roadway geometric alignment design, profile <br />design based on) standards, layout of existing utilities and soil test program as well as field supervision, <br />preparation of drainage structure designs such as exfiltration trench and auger wells, design of <br />miscellaneous details, signing and marking plans, maintenance and protection of traffic plans. <br /> <br />Parsons Brinkerhoff Quade & Douglas, New York, NY <br />1989 -1990 <br /> <br />Senior Civil/Highway Engineer <br /> <br />Long Island Expressway Capacity Improvement Project, Nassau and Suffolk Counties, NY. Prepared <br />preliminary alternative designs for widening of the Long Island Expressway (41.2 miles), including plans, <br />profiles and typical sections. Assisted in the evaluation of existing ramps for future traffic projections. <br /> <br />New York City OMB Project, Parks Road and Parking Areas Condition Survey. Responsible for the <br />pavement condition rating survey of 62 parks in the five boroughs of New York. Responsibilities included <br />production and quality control for the project as well as conducted field work. Street assessment inspector <br />for NYCDOT Office of Transportation Analysis. Analyzed unit prices for costing of maintenance and <br />rehabilitation review of a portion of DOT's development of a pavement management system. Investigated <br />the mapping of water, storm and sanitary sewer lines in 20 parks, and performed cost studies for capital <br />project replacement. Prepared the assessment report on the parks system road and utility improvements. <br />