|
<br />.
<br />.
<br />.
<br />I
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />.
<br />.
<br />.
<br />.
<br />I
<br />.
<br />I
<br />.
<br />.
<br />I
<br />.
<br />I
<br />.
<br />.
<br />.
<br />I
<br />.
<br />I
<br />.
<br />I
<br />.
<br />I
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.,
<br />.
<br />.
<br />
<br />.
<br />
<br />.
<br />I
<br />.
<br />I
<br />.
<br />.
<br />
<br />.
<br />I
<br />
<br />,
<br />.
<br />-
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />I
<br />I
<br />- 1
<br />
<br />LOURDES ENCARNACION
<br />Senior Project Engineer
<br />
<br />
<br />Page 2
<br />
<br />New Miami International Airport Runway/Taxiway - Civil Engineer, Miami-Dade Aviation Department.
<br />Responsible for scheduling and cost estimates. Expansion coordination of multi-task efforts, including
<br />airfield lighting, maintenance of traffic, utilities, signing and pavement markings, drainage and grading.
<br />Extensive use of Microstation/CADD/Geopak software, as well as Microsoft Office and engineering
<br />programs to track design from concept through Cost Estimate. Well versed with various codes, rules,
<br />regulations and laws as they pertain to airport design and construction. Familiar with agencies including
<br />FAA, FDOT, SFWM, DERM and others.
<br />
<br />Florida Department of Transportation, District 4. For Public Transportation Contract responsible for the
<br />CEI Services for FECRR and CSXTRR crossings rehabilitation of railroad and roadway projects. Duties
<br />included overall supervision and inspection of all work performed by the contractors and railroad forces.
<br />Included paving of railroad grade crossings, complete documentation of the trackwork, check of contractor
<br />claims and verifying invoices. Responsible for Rail-Highway Inventory for various FECRR and CSXTRR
<br />crossings in five counties. Responsibilities included field supervision of project, conducting field inspection
<br />and documentation for each crossing in the counties, data collection and data input into FDOT mainframe.
<br />
<br />SR B09/Military Trail PD&E Study, SR 5/US 1 Jewfish Creek Bridge. Multimodal Facility and Metrorail
<br />Extension PD& E Study and 1-95/1-595 Multimodal Transportation Corridor Master. Responsible for
<br />geometric design alignment utilizing GEOPAK/CADD system, preparing profiles, cross sections, super
<br />elevation design and signing and markings for various projects for the Florida Department of Transportation.
<br />
<br />Route 32- Turpentine Run/Red Hook Road in St. Thomas, U.S. Virgin Islands Department of Public
<br />Works. Responsible for the design of USVI which includes geometric horizontal and vertical alignment for
<br />various phases of the project.
<br />
<br />David Plummer & Associates, Coral Gables, Florida
<br />1992 -1993
<br />
<br />Project Highway Engineer
<br />
<br />SR 7 at North New River Canal-Stabilization Bank, Opa Locka Airport Project (Hoxey Road, High
<br />Mast Arm Lighting, Static Ground Rods), Palmetto Expressway (signing & marking design), US 1.
<br />Responsible for the design of minor roadway projects throughout the firm. Specific tasks related to these
<br />efforts included conducting field work, roadway geometric alignment design, utilities coordination, drainage
<br />structure design, signing and marking design, lighting design, traffic signalization design, traffic control
<br />design and final cost
<br />
<br />Ludovici & Orange, Inc., Coral Gables, Florida
<br />1990 - 1992
<br />
<br />Project Highway Engineer
<br />
<br />Miami Dade County Public Works (DCPW. Responsibilities included project scheduling, as well as
<br />technical specifications and technical personnel supervision. Prepared design plans for roadway
<br />improvement and reconstruction projects, which included roadway geometric alignment design, profile
<br />design based on) standards, layout of existing utilities and soil test program as well as field supervision,
<br />preparation of drainage structure designs such as exfiltration trench and auger wells, design of
<br />miscellaneous details, signing and marking plans, maintenance and protection of traffic plans.
<br />
<br />Parsons Brinkerhoff Quade & Douglas, New York, NY
<br />1989 -1990
<br />
<br />Senior Civil/Highway Engineer
<br />
<br />Long Island Expressway Capacity Improvement Project, Nassau and Suffolk Counties, NY. Prepared
<br />preliminary alternative designs for widening of the Long Island Expressway (41.2 miles), including plans,
<br />profiles and typical sections. Assisted in the evaluation of existing ramps for future traffic projections.
<br />
<br />New York City OMB Project, Parks Road and Parking Areas Condition Survey. Responsible for the
<br />pavement condition rating survey of 62 parks in the five boroughs of New York. Responsibilities included
<br />production and quality control for the project as well as conducted field work. Street assessment inspector
<br />for NYCDOT Office of Transportation Analysis. Analyzed unit prices for costing of maintenance and
<br />rehabilitation review of a portion of DOT's development of a pavement management system. Investigated
<br />the mapping of water, storm and sanitary sewer lines in 20 parks, and performed cost studies for capital
<br />project replacement. Prepared the assessment report on the parks system road and utility improvements.
<br />
|