Laserfiche WebLink
<br />. <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />. <br /> <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />.. <br />. <br /> <br />. <br /> <br />. <br />. <br />I <br />~ <br />tt <br />. <br />. <br /> <br />I <br /> <br />. <br />, <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />JOSE SANTIAGO, P.E. <br />Roadway Design Engineer <br /> <br />!~!!~, <br /> <br />EDUCATION <br /> <br />University of Miami, Miami, Florida <br />Bachelor of Science in Civil Engineering, 1996 <br /> <br />REGISTRATION <br /> <br />Florida Professional Engineer No. 60248 <br /> <br />CERTIFICATIONS <br /> <br />Advanced Maintenance of Traffic <br /> <br />SUMMARY OF EXPERIENCE <br /> <br />Mr. Santiago has over 9 years of experience in Transportation Engineering through his work with the Florida <br />Department of Transportation and the private sector. Mr. Santiago's technical and management <br />backgrounds stem from the various positions while at the Florida Department of Transportation, HDR <br />Engineering Inc. and Marlin Engineering Inc. <br /> <br />WORK HISTORY <br /> <br />Marlin Engineering, Inc., Miami, Florida <br />March 2005 to present <br />Senior Project Engineer <br /> <br />FEC RR Crossing on Belvedere Road Safety Improvement, Palm Beach County, FL (November 2005) <br />Engineer of Record for safety improvement project installing a non-traversable median adjacent to FEC <br />Railroad Crossing. Prepared a component set of plans including roadway and signing and pavement <br />marking plans. Plans were designed under a modified schedule template but with all the necessary <br />clearances and documentation required for a safety project. FDOT Project Manager: James Ford (954) <br />777-4434. <br /> <br />Buena Vista East Historic District Streetscape Improvements, City of Miami, FL (2005 - 2006) <br />Engineer of Record and Project Manager for the design and plans production for the resurfacing of NE 42nd <br />Street to NE 48th Street from North Miami Avenue to NE 2nd Avenue. The project includes milling and <br />resurfacing, drainage improvements, ADA compliance, and signing and pavement marking. City of Miami <br />Department of Capital Improvements Project Manager: Tatiana Acosta (305) 416-1263. <br /> <br />NW 25th Street Roadway Reconstruction and New Construction of Viaduct, Miami-Dade County, FL <br />(March 2005 - September 2005) <br />Responsible for the production of the computation book of this major urban reconstruction project. Project <br />was successfully let on December 7th 2005. FDOT Project Manager: Jason Chang, P.E. (305) 470-5331. <br /> <br />Buena Vista Heights Street Improvements Phase 1, City of Miami, FL (March 2005 - August 2005) <br />Engineer of Record and Project Manager responsible for the design and plans production for the <br />resurfacing of NW 38th Street to NW 40th Street between North Miami Avenue to NW 2nd Avenue. The <br />project included milling and resurfacing, drainage improvements, ADA compliance, signing and pavement <br />marking, and landscaping. City of Miami Department of Capital Improvements Project Manager: Anthony <br />Sabbag(305)416-1072. <br /> <br />HDR Engineering, Capital Improvements Department, City of Miami, Florida <br />March 2004 to March 2005 <br />