Laserfiche WebLink
<br />. <br />. <br />. <br />. <br /> <br />I <br />. <br />I <br />~ <br />~ <br />. <br />. <br />t <br />~ <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br /> <br />. <br /> <br />~ <br />~ <br />~ <br />~ <br />. <br />. <br /> <br />I <br /> <br />. <br />. <br />. <br />. <br />.. <br />! <br />. <br />. <br />. <br /> <br />. <br /> <br />I <br /> <br />~ <br />. <br />. <br />. <br />I <br /> <br />. <br />. <br />. <br /> <br />. <br />~ <br />. <br />. <br />. <br /> <br />. <br />. <br />. <br /> <br />._~ <br /> <br />CARLOS GONZALEZ <br />Project Engineer - Roadway Design <br /> <br />~~!!~, <br /> <br />EDUCATION <br /> <br />Bachelor of Science, Civil Engineering, <br />Florida International University, Florida, 1993 <br /> <br />SUMMARY OF EXPERIENCE <br /> <br />laver ten years experience in all aspects of roadway/highway design, plans production, and project <br />I management. Project design experience has included major interstate widening/reconstruction projects. <br />Project Management experience has included a one-year assignment working directly as a FDOT in-house <br />Consultant Manager, responsible for contractual/management tasks on consultant produced Roadway Design <br />projects. <br /> <br />WORK HISTORY <br /> <br />Marlin Engineering, Inc., Miami, Florida <br />August 2006 to Present <br />Senior Project Engineer <br /> <br />Florida Department of Transportation District Four - Permit Coordinator. Permit coordinator for the <br />nothern counties. Responsible for compliance with FDOT's design criteria standards for new developments <br />I with new driveways connections, access management, signals, lane widening and drainage. <br /> <br />SR 834 - Sample Road. Project Engineer responsible for development of roadway cross sections, signing and <br />markings and earthwork quantities. The project includes milling and resurfacing, upgrade of pedestrian curb <br />ramps, and access management improvements. <br /> <br />HDR Engineering, Miami Lakes, Florida <br />May 2005 to August 2006 <br />Senior Project Engineer <br /> <br />Florida Department of Transportation District Four - Consultant Management. Project Manager working <br />I in-house with the Department of Transportation's Consultant Management office. Responsible for serving as <br />I the Department of Transportation's Manager for consultants' working on Final Design and Post Design <br />Services for Plans Production projects across the District. Served as the Department's point of contact and <br />I project coordinator/facilitator on Project Management functions including budget, schedule, quality, and <br />consistency with Department objectives. <br /> <br />SR 60 RRR Design - FDOT District 4, Indian River County, FL Responsibilities include public involvement, <br />permitting, and utility coordination. The project includes a one-way pair through the downtown district, inclusion <br />I of new concrete sidewalk where missing, and vertical sight distance criteria violation (analysis/mitigation). <br />I Intense public outreach with the City of Vero Beach and the community at large was necessary due to the <br />mixed community reaction to the possibility of reversing the on-way pair back to two-way sections each. <br /> <br />Parsons - PTG, Miami, Florida <br />June 1996 to May 2006 <br />Project Engineer <br /> <br />Sawgrass Expressway Widening Design - Turnpike Enterprise, Broward County, FL Deputy Project <br />Manager responsible for the design and calculations of preliminary drainage analysis. Responsible for the overall <br />geometric, vertical design, earthwork and quantities. <br /> <br />Design Services for Sunpass Challenge - Turnpike Enterprise. Responsible for Roadway Design. The <br />project includes modifications to various toll plazas on the Florida's Turnpike System. A total of twenty sites <br />were included. Elements of work included roadway and ramp widening, architectural, drainage, signing and <br />pavement markings, lighting, utility relocations, maintenance of traffic, and environmental permitting. <br /> <br />154th Street and 122nd Ave - City of Miami, Miami, FL This job involved the design of a concrete curved road. <br />Responsibilities included the roadway design, maintenance of traffic, the development of roadway cross sections and <br />earthwork quantities. <br />