Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />n <br /> <br /> <br />our technical and support staff to ensure they are up to date on current technology use <br />and applications. <br /> <br />Specialized Software - Engineering: Expert Choice (AHP), Autodesk AutoCAD 2008, <br />Autodesk AutoCAD Civil 3D 2008, Microstation, Microstation Image Manager, Geopak, <br />In-Roads, Microsoft Project, Microsoft Masterpiece (3D Imaging), Descartes ArcView <br />and Arclnfo (GIS) and an FTP site for CADD files or other large data file transfers. <br /> <br />Traffic: HCS, Signal97, Synchro, Transit-7F, Netsym, SIDRA, TSIS, Petra, Peek, AAP, <br />AHP <br /> <br />Other: Microsoft Office 2000, PowerPoint, Adobe Illustrator CS2, Corel Draw, Corel <br />Photo Paint, Primavera, Adobe Acrobat. <br /> <br />Specialized Hardware - Over 20 Pentium 3.0Mhz or higher workstations with dual 20" <br />LCD monitors, 5 color laser printers, 3 color copier, two HP 1050 Color Plotter, laptops, <br />portable video projectors, digital cameras with 7.1 dpi resolution, GPS Survey <br />Equipment and vacuum and radar locators for underground utility location <br /> <br />We are fully capable of providing in-house publishing with our 3 new Ricoh Africio <br />Copiers and specialized software such as ADOBE Photoshop, Acrobat, Framemaker <br />and PageMaker. This helps us prepare brochures, maps, and any other graphics on <br />virtually any type of paper, giving us much more flexibility than if this were outsourced. <br /> <br />Qualitv Control and Assurance <br /> <br />Quality Control Plan: A key aspect to any successful project is a successful and well- <br />implemented quality control plan. MEI has developed a quality control approach that <br />can be tailored to the specific needs and requirements of each client. It should be noted <br />that reviews by experienced and independent personnel are built into every Quality <br />Control Plan ensuring that comments are meaningful and constructive. All of our <br />subconsultants are required to submit a Quality Control Plan (QCP) that must be <br />approved by MEl's Project Manager prior to the commencement of the work. <br /> <br />The Quality Control Plan (QCP) for these specific projects will initially be prepared by <br />MEI and submitted to the City's Project Manager within 10 working days of NTP. Within <br />this plan we will identify the independent review team that will be conducting the QC <br />reviews at various stages of the project's life. Once the City's Project Manager <br />approves the QCP, the independent review team will be part of the overall design team. <br /> <br />They will receive copies of all design notes, reports and drawings along with quality <br />control sets of drawings at each phase submittal. <br /> <br />Metric Engineering is committed to supporting the City of Sunny Isles Beach's <br />professional staff in the successful execution and completion of this contract. With this <br />team of quality and seasoned engineers and technicians, managers and state of the art <br />equipment we firmly believe we offer you the best team for this contract. <br /> <br />Page 8 <br />