My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
The Corradino Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:22:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.. <br />. <br />I: <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.. <br />,. <br />I. <br />I. <br />. <br /> <br />!. <br />'. <br />I. <br />I. <br />I. <br />I ,..... <br /> <br />o <br />z <br />- <br />c <br />< <br />0::: <br />0::: <br />o <br />U <br /> <br />2 Proiects Experience <br /> <br />Corradino has worked on civil engineering projects for municipalities since its inception in 1971. Its <br />current general services contracts include Hialeah, Miami Beach, Palmetto Bay, Cutler Bay, Doral <br />and Miami. The services provided under these contracts have focused on the design of numerous <br />civil engineering, traffic calming, transportation engineering, water and sewer, construction <br />management, parks and recreation and emergency management services. <br /> <br />Corradino has successfully provided engineering services on a wide range of projects for municipal <br />clients throughout South Florida. <br /> <br />The engineering process that will be followed for a project includes pre-design, design and post- <br />design. <br /> <br />The Pre-design Phase will include a coordination meeting with city staff on the specific project to <br />establish project criteria (time, budget, schedule, objectives). This will be followed by meetings with <br />team members to make specific task assignments, review existing studies and preliminary design <br />plans on the project, establish requirements for stakeholder involvement, conduct a preliminary site <br />visit to confirm site constraints on design and construction, evaluate easement/right-of-way <br />acquisition issues, and assess environmental evaluation/community impact. <br /> <br />Permitting requirements will be identified in the pre-design phase and meetings will be held with <br />permitting agencies, as appropriate. A matrix of all required permits will be prepared to facilitate <br />the processing of required permits. <br /> <br />The project schedule will be prepared and tracked using computer scheduling/project management <br />software (Microsoft Project). Projects can be tracked as separate free-standing projects or they can <br />be merged into one schedule to reveal key milestones and potential conflicts, as well as anticipate <br />resource allocation. All tasks and activities are tagged to specific team staff resources, making it <br />possible to generate histograms for all individuals involved on the project. All staff resources can <br />be revealed at the same time, enabling the Corradino project manager to see possible resource <br />misallocation and quickly re-appropriate the needed labor hours to the required tasks. <br /> <br />The budget established will be managed using Corradino's job cost accounting system (BST <br />Enterprise). <br /> <br />Corradino is experienced at civil design, having conducted many engineering projects for state and <br />municipal agencies. For these projects, we have followed design detail standards of the agency <br />including complete construction bid packages. The design phase of a project will include, as <br />appropriate, survey, geotechnical, hydraulic and hydrologic investigations, and utility investigations. <br />Once completed, engineering design plans will be prepared and submitted in accordance with city <br />criteria for percent complete plan submittals and review. Corrections for each plan stage submittal <br />will be incorporated into the next design plan submittal. <br /> <br />QNQC procedures will be followed, as appropriate, for each stage of design plan submittal. The <br />objective of the QNQC program will be to ensure that our services are based on sound <br /> <br />('I') <br />1lI <br />t!) <br /><: <br />ll. <br />
The URL can be used to link to this page
Your browser does not support the video tag.