Laserfiche WebLink
<br />?p.r~fi:~~;:[;a11~~ngil1e~rin~~Jft,&*rir~ <br />'-""'_~'~~I '(fJ~\ ,\\\ ~Yi!l~:i4!::' '\ r,:-'~~"1~t:'~'~~'"'~ <br />'~.~~~{l''Fo~l1ie (iiWlBf!~unnM\IsI~s.'Betl-rJr '~J'~ <br />. >1' . ,\\ X\. ~11~1" ~l! "~a If - <br /> <br />Education <br />M.S.E. - Civil Engineering and <br />Environmental Sciences <br />B.S.E. - Civil Engineering and <br />Environmental Sciences <br /> <br />licenses <br />Professional Engineer, State of <br />Florida #17607 <br /> <br />Years of Experience <br />28 <br /> <br />Education <br />B.S. Civil Engineering, University <br />of Central Florida <br /> <br />Licenses <br />Professional Engineer, State of <br />Florida <br /> <br />Years of Experience <br />16 <br /> <br />Larr More , P.E. <br /> <br />Pro'eet En ineer <br /> <br />Mr. Morey's professional career spans over 30 years, with emphasis on performing design, OAlOC and <br />construction phase services for highway projects, providing technical assistance to staff, and working closely <br />with various clients on multiple projects throughout Florida. <br />Recently he has worked on these representative projects: <br />. (Osceola County) - Michigan Avenue final design and construction phase services for widening and <br />resurfacing 1.1 miles of 3-lane rural collector to 5,Iane urban. <br />. (Putnam County) - SR 19 construction phase services for widening and resurfacing 0.7 mile of <br />existing 2-lane rural arterial to 4-lane divided urban. <br />. (City of Deland) - East Indiana Avenue Streetscape final design and construction phase services <br />for 0.12 mile. <br />. (Seminole County) - CR 415 Celery Avenue preliminary engineering services for needs assessment <br />of 2,5 miles of existing 2-lane rural collector. <br />. (Seminole County) CR419 final design for reconstruction of 3 miles of existing 2,Iane rural collector <br />to 4-lane divided urban and rural. Included a new bridge over the Econlockhatchee River. <br />. (FOOT Dist. 1 - Manatee County) SR 64 final design and construction phase services for widening <br />and resurfacing 1.4 miles of existing 4-lane undivided urban arterial to 5-lane urban, This also <br />included widening of the existing bridge over Wares Creek. <br />. (FOOT Dist. 1 - Okeechobee County) SR 70 final design and construction phase services for <br />reconstruction of 2 miles of existing 2,Iane rural arterial to 4-lane divided urban. Project included a <br />new bridge over the CSX Railroad. <br />. (FOOT Dist. 1 - Polk County) SR 540 final design and construction phase services for <br />reconstruction of 1.3 miles of existing 2,Iane and 3,Iane rural arterial to 4,lane divided urban. <br />Includec!. a new bridge over lake Ina. <br /> <br />CPH Engineers, Inc. <br /> <br />Kurt Luman, P.E. <br /> <br />Pro'eet En ineer <br /> <br />Mr. Luman series.the firm of CPH Engineers, Inc. i'n the capacity of ProTect Engineer. As a graduate of the <br />University of Central Florida, Kurt has the educational background, as well as the computer abilities to ably <br />assist the team in various aspects of Civil Engineering. He has assisted in the permitting of various projects <br />with FDEP Water and Sewer sections, St. Johns River Water Management District, FOOT, Seminole County, <br />Volusia County, Putnam County, and the revision of flood zones with FEMA. Recent Projects Include: <br />. Honore Avenue and University Parkway, Manatee County and Sarasota County, Fl - Worked <br />as Project Engineer for this roadway improvement project and performed stormwater analysis <br />and design. He also assisted with permitting with The Southwest Florida Water Management <br />District, Sarasota County, and Manatee County. <br />. University Park Center and Colonial Trace Reciprocal Access Improvements, Manatee County, <br />Fl - As a Project Engineer, Kurt performed the stormwater analysis and design, and assisted <br />with the permitting with the Southwest Florida Water Management District and Manatee <br />County. <br />. Michigan Avenue Widening, Kissimmee, Fl - Kurt has worked as a Project Engineer for this <br />project, which involved drainage design and coordination of all the various permitting and <br />jurisdictional agencies for a 1.2 mile stretch of roadway. He also provided quantity take,offs <br />and quality control for this project. <br />. Heathrow Country Estate, lake County, Fl - Kurt provided engineering assistance with the <br />new Heathrow Country Estate PUD located in lake County, FL. His assistance has included <br />pre and post analysis of stormwater run-off, and permitting assistance with the Florida <br />Department of Environmental Protection, the St. Johns River Water Management District, <br />FOOT, and lake County. <br />. SR 19, Putnam County, FL - As a project engineer for this .7 mile roadway widening project, <br />Kurt has prepared quantity take-offs, and provided quality control over this Putnam County job. <br />He has assisted ~tl:!Jhe drainage design. <br /> <br />CPH Engineers, Inc. <br /> <br />Engineers . Surveyors . Architects . Planners . Landscape Architects . Environmental Scientists . Construction Management . Design/Build Quality & Innovation I <br />For Design & Construction <br />