|
<br />?p.r~fi:~~;:[;a11~~ngil1e~rin~~Jft,&*rir~
<br />'-""'_~'~~I '(fJ~\ ,\\\ ~Yi!l~:i4!::' '\ r,:-'~~"1~t:'~'~~'"'~
<br />'~.~~~{l''Fo~l1ie (iiWlBf!~unnM\IsI~s.'Betl-rJr '~J'~
<br />. >1' . ,\\ X\. ~11~1" ~l! "~a If -
<br />
<br />Education
<br />M.S.E. - Civil Engineering and
<br />Environmental Sciences
<br />B.S.E. - Civil Engineering and
<br />Environmental Sciences
<br />
<br />licenses
<br />Professional Engineer, State of
<br />Florida #17607
<br />
<br />Years of Experience
<br />28
<br />
<br />Education
<br />B.S. Civil Engineering, University
<br />of Central Florida
<br />
<br />Licenses
<br />Professional Engineer, State of
<br />Florida
<br />
<br />Years of Experience
<br />16
<br />
<br />Larr More , P.E.
<br />
<br />Pro'eet En ineer
<br />
<br />Mr. Morey's professional career spans over 30 years, with emphasis on performing design, OAlOC and
<br />construction phase services for highway projects, providing technical assistance to staff, and working closely
<br />with various clients on multiple projects throughout Florida.
<br />Recently he has worked on these representative projects:
<br />. (Osceola County) - Michigan Avenue final design and construction phase services for widening and
<br />resurfacing 1.1 miles of 3-lane rural collector to 5,Iane urban.
<br />. (Putnam County) - SR 19 construction phase services for widening and resurfacing 0.7 mile of
<br />existing 2-lane rural arterial to 4-lane divided urban.
<br />. (City of Deland) - East Indiana Avenue Streetscape final design and construction phase services
<br />for 0.12 mile.
<br />. (Seminole County) - CR 415 Celery Avenue preliminary engineering services for needs assessment
<br />of 2,5 miles of existing 2-lane rural collector.
<br />. (Seminole County) CR419 final design for reconstruction of 3 miles of existing 2,Iane rural collector
<br />to 4-lane divided urban and rural. Included a new bridge over the Econlockhatchee River.
<br />. (FOOT Dist. 1 - Manatee County) SR 64 final design and construction phase services for widening
<br />and resurfacing 1.4 miles of existing 4-lane undivided urban arterial to 5-lane urban, This also
<br />included widening of the existing bridge over Wares Creek.
<br />. (FOOT Dist. 1 - Okeechobee County) SR 70 final design and construction phase services for
<br />reconstruction of 2 miles of existing 2,Iane rural arterial to 4-lane divided urban. Project included a
<br />new bridge over the CSX Railroad.
<br />. (FOOT Dist. 1 - Polk County) SR 540 final design and construction phase services for
<br />reconstruction of 1.3 miles of existing 2,Iane and 3,Iane rural arterial to 4,lane divided urban.
<br />Includec!. a new bridge over lake Ina.
<br />
<br />CPH Engineers, Inc.
<br />
<br />Kurt Luman, P.E.
<br />
<br />Pro'eet En ineer
<br />
<br />Mr. Luman series.the firm of CPH Engineers, Inc. i'n the capacity of ProTect Engineer. As a graduate of the
<br />University of Central Florida, Kurt has the educational background, as well as the computer abilities to ably
<br />assist the team in various aspects of Civil Engineering. He has assisted in the permitting of various projects
<br />with FDEP Water and Sewer sections, St. Johns River Water Management District, FOOT, Seminole County,
<br />Volusia County, Putnam County, and the revision of flood zones with FEMA. Recent Projects Include:
<br />. Honore Avenue and University Parkway, Manatee County and Sarasota County, Fl - Worked
<br />as Project Engineer for this roadway improvement project and performed stormwater analysis
<br />and design. He also assisted with permitting with The Southwest Florida Water Management
<br />District, Sarasota County, and Manatee County.
<br />. University Park Center and Colonial Trace Reciprocal Access Improvements, Manatee County,
<br />Fl - As a Project Engineer, Kurt performed the stormwater analysis and design, and assisted
<br />with the permitting with the Southwest Florida Water Management District and Manatee
<br />County.
<br />. Michigan Avenue Widening, Kissimmee, Fl - Kurt has worked as a Project Engineer for this
<br />project, which involved drainage design and coordination of all the various permitting and
<br />jurisdictional agencies for a 1.2 mile stretch of roadway. He also provided quantity take,offs
<br />and quality control for this project.
<br />. Heathrow Country Estate, lake County, Fl - Kurt provided engineering assistance with the
<br />new Heathrow Country Estate PUD located in lake County, FL. His assistance has included
<br />pre and post analysis of stormwater run-off, and permitting assistance with the Florida
<br />Department of Environmental Protection, the St. Johns River Water Management District,
<br />FOOT, and lake County.
<br />. SR 19, Putnam County, FL - As a project engineer for this .7 mile roadway widening project,
<br />Kurt has prepared quantity take-offs, and provided quality control over this Putnam County job.
<br />He has assisted ~tl:!Jhe drainage design.
<br />
<br />CPH Engineers, Inc.
<br />
<br />Engineers . Surveyors . Architects . Planners . Landscape Architects . Environmental Scientists . Construction Management . Design/Build Quality & Innovation I
<br />For Design & Construction
<br />
|