Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />:1 <br />'I <br />'I <br />!. <br />I <br />I <br />I <br />I <br />~ <br /> <br />FIRM QUALIFICATIONS <br /> <br />Contact: <br />Ronald Steiner, P.E. <br />(305) 470-5354 <br />ron aid .steiner@dot.state.fi.us <br /> <br />Services <br /> <br />District 6 <br /> <br />.~, if" .-. f.~ <br />ertS. ~~/ <br />,~ri . '1 <br />.,/ <br /> <br />,';" ~ <br />?'J"" <br /> <br />Com pie t ion D ate: September 2004 - December 2005 <br /> <br /> <br />ACQUALlNA <br />Sunny Isles Beach, <br />Florida, Miami-Dade <br />County <br /> <br />Client: <br />Williams Island Associates, <br />Inc. <br />7900 Island Boulevard <br />Aventura, FL 33160 <br /> <br />Contact: <br />AI Guttentag <br />Tel. (954) 438-4300 <br />Fax (954) 438-1433 <br />aq utten taq@wsqdevelopment.net <br /> <br /> <br />~ <br /> <br />{""'- <br /> <br />c.....,.. <br /> <br />Services Performed: Project consisted of the <br />development of a fifty-two stories residential condominium/hotel <br />facility. The project was developed on approximately 4.60 acres of <br />property located along the east side of Collins Avenue (State Road <br />A-1-A) just south of 178th Street in the City of Sunny Isles. <br />Responsibilities included complete civil engineering design, <br />permitting, and construction inspections services to include paving, <br />grading, drainage, water and sewer services, and offsite parking <br />garage design. <br /> <br />Com pIe t ion D ate: September 2000 - September 2004 <br /> <br /> <br />CARILLON HOTEL CONDOMINIUM <br />Miami Beach, Florida, Miami-Dade County <br />Client: <br />WSG Development & <br />Construction <br />400 Arthur Godfrey Rd, <br />Suite 200 <br />Miami Beach, FI. 33140 <br /> <br />Contacts: <br />Eric Sheppard <br />Dieter Utner <br />Tel. (305) 673-3707 <br />Fax (305) 673-6711 <br /> <br /> <br />Services Performed: The project consisted of a new <br />hotel and residential development, and the reconstruction of the <br />existing Carillon Hotel. Consul-Tech was responsible for full civil <br />engineering design of paving, grading, drainage, water, and sewer <br />plans and details. Services included site planning and surveying, <br />permitting, and construction inspections. <br /> <br />Com pie t ion D ate: November 2004 -November 2004 <br /> <br /> <br />FONTAINEBLEAU NEW RESORT <br />(NORTH TOWER) <br />Miami Beach, Florida, Miami-Dade County <br /> <br />Client: <br />HKS Architect Inc. <br />1919 McKinney Avenue <br />Dallas, Texas 75201 <br /> <br /> <br />Contacts: <br />Rick Lee, Sr. Vice <br />President <br />Tel. (214) 969-5599 <br />Fax (214) 969-3397 <br />rlee@hksinc.com <br /> <br />Services Performed: The project consists of the <br />demolition and reconstruction of the Fontainebleau North Tower <br />and Parking Garage, the remodeling of the existing Chateau <br />Tower and the redevelopment of the landscape and pool areas <br />east of the existing buildings (also known as Great Lawn). Consul- <br />Tech is performing complete civil engineering design of paving, <br />grading, drainage, water and sewer. Services also include <br />topographic and boundary survey services, permitting and <br />construction inspections services. <br /> <br />Com pletion Date: November 2005 - August 2007 <br /> <br />Perf 0 r me d : Consul-Tech provided relief <br />efforts for the areas affected by <br />Hurricane Katrina, Rita and <br />Ivan, managing a group of <br />contractors and subconsultants <br />to handle all aspects of recovery <br />efforts. The Hurricane Recovery <br />Program included management, <br />inspection and construction <br />management services for <br />Monroe and Miami-Dade <br />Counties, Florida. <br /> <br />RFQ No. 07-07-01 - Professional General Engineering Consultant <br /> <br />Page 7 <br />