Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />:1 <br />I. <br />I. <br />I <br />II <br />II <br />In <br /> <br />STAFFING PLAN <br /> <br />The following is a brief introduction and qualifications of the <br />key personnel for this request. Their detailed resumes are <br />included in the SF 255. Our organizational chart (See Figure <br />1) highlights the key personnel assigned to this project. <br /> <br />Juan Muniz, P,E., Project Manager <br />Mr. Muniz will be the Project Manager and will be directly <br />responsible for the overall project management, planning, and <br />coordination for this contract. Mr. Muniz will be responsible for <br />all project deliverables to the City of Sunny Isles Beach. Mr. <br />Muniz has over 15 years of experience and is responsible for <br />managing private land development, municipal, and roadway <br />projects, including residential (single family, multi-family, high <br />rise condominium, and dormitory), commercial (office, <br />warehouse, shopping center, and retail centers), industrial <br />(distribution centers, manufacturing facilities of various type <br />automotive repair, etc.) and municipal utility (water, sewer, <br />and drainage) projects. Roadway experience includes <br />knowledge of all aspects of roadway design including <br />drainage, plans and profiles, cross sections, and maintenance <br />of traffic plans. <br /> <br />Andres Garganta, P.E. - Principal-in-Charge <br />Mr. Garganta has over 33 years of experience in roadway <br />design projects. He has been personally involved in the design <br />and/or supervision of major design projects such as the FOOT <br />General Engineering Consultant contract for District Six, <br />Miami-Dade County; S.R. 874 Killian Parkway Improvements, <br />Miami-Dade County; Palmetto Expressway at Bird Road, <br />Miller Drive, and S.R. 874, Miami-Dade County; Palmetto <br />Expressway at N.W. 74 Street, Miami-Dade County; Golden <br />Glades Toll Plaza Improvements, Miami-Dade County; and the <br />U.S. 1 (S.R. 5) from Card Sound Road to Mile Post 6.00, <br />Miami-Dade County. Mr. Garganta's experience in <br />transportation master planning, conceptual design, structural, <br />and traffic engineering, including three years as a Florida <br />Department of Transportation District Manager are invaluable <br />to the management of any project. <br /> <br />6.00, Miami-Dade County, S.R. 112 on Ramp from NW. <br />36 Street, Miami-Dade County, and North Roosevelt <br />Boulevard reconstruction improvements (under design), in <br />Monroe County. <br /> <br />Hermes Diaz, P.E. - Task Manager- Civil Engineering <br />Mr. Diaz has over 8 years of experience in civil <br />engineering design. He has been responsible for the <br />managing of the design phase of multiple projects within <br />Miami-Dade County including the development of <br />engineering plans (water, sewer, paving and drainage), <br />site plans, drainage modeling, and drainage reports and <br />calculations, as well as coordination of projects with <br />multiple government agencies and permitting. <br /> <br />Edgar Espinoza, E.!. - Civil Engineering <br />Mr. Espinoza has over 18 years of project management <br />experience in water and sewer master planning, design, <br />permitting, project costing & scheduling, bid processes and <br />construction management of roadway, land development, <br />drainage and utility coordination projects. Mr. Espinoza's <br />experience also encompasses Water and Wastewater <br />Treatment Plant design and management of National <br />Pollutant Discharge Elimination Systems (N.P.D.E.S.) <br />program with the Florida Department of Transportation' <br />Turnpike District. <br /> <br />Juvenal Santana, E.I. - Civil Engineering <br />Mr. Santana has over 7 years of experience in the design <br />of water, sewage and drainage systems for residential, <br />commercial and industrial facilities, as well as the <br />construction engineering inspection of such systems. <br />Activities include investigation of existing site conditions, <br />calculation of proposed quantities of water usage and <br />preparation of design reports and cost estimates for water, <br />sewer and drainage systems. Design aspects include <br />calculations for sizing, flow requirements, treatment, and <br />all components associated with municipal water and sewer <br />systems, sewage pump stations. Also accountable for <br />production of design plans and coordination with all <br />professionals and technical disciplines involved in each <br />project. <br /> <br />Evelio Chavez, P,E. - QA/QC Manager <br />Mr. Chavez has been assigned as senior level Project <br />Manager who will oversee the QNQC effort, and will assign <br />the independent reviewers for this project. Mr. Chavez has <br />over 22 years experience and has managed and successfully GiI Portela, P.E., Task Manager - Transportation <br />completed numerous roadway projects that include: City of Engineering <br />Miami General Engineering Consultant, Miami-Dade County; Mr. Portela has over 23 years experience in roadway <br />City of Miami Program Management Services, Miami-Dade design and management for urban and interstate roadway <br />County, S.R. 826 (Palmetto Expressway) Interchange at Miller projects. He has been responsible for pavement design, <br />Drive, S.R. 874, and Bird Road (under design), in Miami-Dade drainage and maintenance of traffic, overhead guide sign <br />County; U.S. 1 (SR. 5) from Card Sound Road to Mile Post design, pavement markings, signalization, and traffic <br /> <br />, RFQ No. 07-07-01 . Professional General Engineering Consultant Page 13 <br />