My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tim Haahs Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Tim Haahs Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:50:47 PM
Creation date
2/28/2011 3:44:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park & Pkg Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'I <br /> <br />PROFESSIONAL DESIGN SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH, MIAMI-DADE COUNTY FLORIDA <br />RFQ # 07-08-01 <br /> <br />i);,"".' "'"\ <br />. --, " <br />~J <br /> <br /> <br />., ~ ,,,<; <br /> <br />II <br />II <br /> <br />I <br /> <br />disabilities. <br />· Design shall reflect the City's essence as a srnall town, with a walkable, sustainable and <br />cornmunity life enhancernent. <br />· Integration of Heritage Park with desired amenities, and interface with the garage and <br />surrounding streetscape. <br />· Consider use of garage for storage of vehicles during storms. <br />3. Finalize Civil and Site layout, access drives, utilities, landscape, hardscape, and storm water <br />rnanagement. <br />4. Structural <br />· Foundation plan layout <br />· Ground, typical and top tier plan with key dirnensions and critical detail locations <br />· Preliminary structural sizes <br />· Discuss durability issues <br />· Typical sections and details <br />5. Architectural <br />· Consider the existing architectural fabric of adjacent buildings keeping in mind the historic <br />district and buildings on the National Register. <br />· Refine architectural fa<;:ade treatment to be "neighborhood friendly." <br />6. Landscape Architecture <br />· Consider the existing streetscape and fabric of adjacent buildings, while providing the <br />desired open space and amenities to create the desired park space and uses. <br />· Fully integrate the design of the park with the layout of the garage to create a active, <br />attractive, usable space for residents and visitors. <br />7. Mechanical, Electrical, Plumbing and Fire Protection <br />· Provide preliminary specifications for lighting fixtures and circuitry, <br />· Refine lighting plan and recommend interior lighting levels to rneet Energy Codes, yet <br />adequate for safety. <br />· Refine typical and top tier plumbing plan showing standpipes, floor drains and cold water <br />washdown systern <br />· Sprinkler systems (as required) <br />· Alarm stations <br />· Security systerns (CCTV, etc.) <br />8. Parking Access and Revenue Control Systern (PARCS) <br />· Provide preliminary design of entry/exit configuration of aisles/lanes <br />· Provide details and specifications <br />9. Graphics <br />· Prelirninary graphic concepts to include interior signage, sign style and colors, sign location <br />and text. <br />· Diagram signage for both pedestrian and vehicular circulation in the park and garage. <br />· ADA regulations regarding accessible parking spaces for persons with disabilities. <br />10. Meet with representatives of City to discuss the design development documents. <br />11. Perforrn an in-house peer-review of all design documents to ensure that the original design intent <br />and technical requirements are met, <br />12. Review and report to the City findings on value management/engineering, constructability, <br />maintainability, and life cycle cost considerations to the design. <br />13. Update project cost estimate. <br />14. Attend project rneetings as necessary. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Phase 3: Construction Documents Phase <br /> <br />I <br /> <br />Upon City's review and approval of Phase 2: Design Development, TimHaahs will perform the following <br />Construction Docurnentation services: <br /> <br />1. Prepare all Construction Docurnents consisting of General and Bidding Conditions, drawings and <br /> <br />I Tim~~~h~ECT5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.