My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-04-01 Restaurant at Fishing Pier
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2011 10:22:09 AM
Creation date
3/3/2011 10:19:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Restaurant at Pier Park
Bid No. (xx-xx-xx)
09-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH, FLORIDA <br /> <br />REQUEST FOR PROPOSAL NO. 09-04-01 <br /> <br />PROFESSIONAL SERVICES TO DESIGN, BUILD OUT AND OPERATE A <br />RESTAURANT AT THE HISTORIC FISHING PIER AT PIER PARK <br /> <br />1.1 INTRODUCTION <br /> <br />Pursuant to Chapter 62 of the City Code, the City of Sunny Isles Beach, Florida, (the "City") <br />a municipality located in Miami-Dade County, Florida, requests qualified contractors <br />("contractors") to submit proposals to design, build out and operate a restaurant at the <br />historic Fishing Pier at Pier Park, 16501 Collins Avenue. The contract will be awarded by <br />the City to the Proposer whose proposal best serves the interests of, and represents the best <br />value to, the City in accordance with the criteria set forth in Section 62-8 of the City Code. <br /> <br />1.2 BACKGROUND <br /> <br />The City of Sunny Isles Beach, located between the Atlantic Ocean and the Intracoastal <br />Waterway in Northeast Miami-Dade County, surrounded by Aventura, Golden Beach, Miami- <br />Dade Haulover Park and Marina, and Bal Harbour, is owner to the only public fishing pier in <br />Miami-Dade County, a historic pier. As the existing pier is being rebuilt, a shell for a larger, <br />5,000 square foot, restaurant, with seating for at least 200, will be included. An aerial of the <br />location of the existing Pier is included in this package. (See Attachment "D") The design <br />plans for the pier and this shell are near completion and permitting has commenced. A <br />schematic is included in this package (See Attachment "E") and the specific plans are available <br />upon request. <br /> <br />Interior design and layout is the responsibility of the Proposer and must meet with approval by the <br />City. The City will consider all types of design and atmosphere but requires minimum operating <br />hours of 12 hours per day, 7 days per week. <br /> <br />1.3 DESCRIPTION OF THE PROJECT <br /> <br />The Project shall be divided into three phases: (1) Design Phase, (2) Construction Phase and (3) <br />Operation Phase. The selected Proposer shall complete all three phases of the Project and shall be <br />the sole prime Contractor with the City. The selected Proposer wishing to use subcontractors to <br />perform anyone or more than one phase of the Project shall be responsible for engaging the <br />professional(s) or firm(s) that will serve as subcontractors. The subcontractors (if any) shall meet <br />all City subcontractor requirements prior to the start of the Contract. The three phases of the <br />Project are more particularly described as follows: <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.