Laserfiche WebLink
<br />1. Desi2n Phase <br /> <br />A. Conceptual Plans <br /> <br />After contract award, and prior to any construction beginning, the selected Proposer shall <br />prepare, and submit for City approval, a proposed Conceptual Plan for the design of the <br />Restaurant including restrooms. The Conceptual Plan must incorporate elements which make <br />the Restaurant compatible with the design of the Pier and oceanfront setting. The appearance <br />of the Restaurant is subject to approval by the City, at its sole discretion, which will not be <br />umeasonably withheld. Extra consideration will be given to Proposers that include a <br />description of the Conceptual Design or intended theme in the RFP package but is not <br />necessary. <br /> <br />B. Design <br /> <br />The Proposer shall incorporate into the Restaurant design as many features of the Leadership in <br />Energy and Environmental Design for New Construction (LEED-NC) Green Building Rating <br />System as necessary to fulfill the requirement s to meet the criteria of LEED-NC. <br /> <br />The Proposer shall submit all renderings, photographs, floor plans, specification sheets, cut <br />sheets, proposed paint schemes and graphics for all furnishings, fixtures, equipment, and soft <br />goods to the City for approval. <br /> <br />The Restaurant design must comply with all the design parameters and building requirements <br />of the City's Code of Ordinances and South Florida Building Codes. <br /> <br />2. Construction Phase <br /> <br />A. Restaurant and Restroom <br /> <br />1. The selected Proposer shall have access to the premises for build out once that portion of the <br />pier and the shell are substantially complete. <br /> <br />2. The selected Proposer shall perform all construction and improvements in compliance with <br />the Building Code and with all necessary permits and approvals. City approval of the design <br />and plans must be obtained prior to submission to the Building Department. <br /> <br />3. The Proposer shall submit to the City a cost estimate of the build out of the Restaurant, <br />including all furnishings, fixtures and proposed equipment, and a comprehensive timeline for <br />the start-up of the Restaurant including the construction phase. The Proposer shall bear all <br />costs associated with all improvements of, and fixtures and equipment installations at, the <br />Restaurant. All such improvements and installations shall become the property of the City at <br />the time of termination or default of the Lease Agreement by either party. This cost estimate <br />is due within 30 days after approval of design and concept. <br /> <br />4. The selected Proposer shall be expected to complete the build out of the Restaurant before <br />the Restaurant's anticipated full operational date of June 1,2010. In the case that delays are <br />beyond the reasonable control of the selected Proposer, the City may, at its sole discretion, <br />grant a written extension. Failure to comply with this provision may result in termination of <br />the contract. <br /> <br />5. The selected Proposer shall have access to the number of parking spaces required per City <br />Code to be shared with the Pier, Park and Newport Beachside Hotel and Resort. The selected <br /> <br />4 <br />