<br />o <br /> <br />o <br /> <br />o <br /> <br />complexes and stacking it on public rights-of-way (ROW). Generally, debris will not be collected during this stage, <br />though under certain circumstances debris removal may be conducted. <br /> <br />The primary goal here is to create immediate safe passage for emergency response vehicles and equipment. Mechanized <br />rubber-tired lifting and pushing equipment and specialized ground labor with chain saws and other hand tools are used to <br />complete this phase of work. We will use our own equipment and tools as well as local subcontractors who are under <br />standby contract with us. Estimates from the initial damage survey will determine the required response necessary to <br />facilitate a rapid recovery. We will escalate equipment and crew sizes to the appropriate level to execute this task. <br />Based on the initial survey, crews will be deployed to areas with the greatest damage and need. The triage method of <br />deployment will apply under all scenarios, ensuring that emergency routes are expeditiously cleared to minimize safety <br />hazards and risks to public health. <br /> <br />Rapid road clearance is achieved through pre-planning and coordination with the local authorities, the local workforce <br />and first response subcontractors. Critical pre-specified clearance routes are generally prioritized to target: first, access <br />to hospitals, fire stations, police stations, designated public shelters, airports and other vital public facilities; second, <br />access to essential public and private utility facilities and systems; third, clearance of major arteries; and last, clearance <br />of residential streets and byways. <br /> <br />Ash Britt senior management and field supervisors will oversee this critical phase of the recovery, while continuing to <br />assess the damage via "closer-look" surveys. Crews will be instructed to protect to the greatest extent possible existing <br />undamaged City infrastructure. Any damage that occurs will be documented, reported to the City Debris Manger (OM) <br />and rectified in a timely manner. Crews will also be mandated not to interfere to the best of their abilities with the <br />disaster response activities of any governmental agencies or public utility. Further, they will be instructed and drilled to <br />segregate debris to the greatest extent possible, while minimizing the obstruction of driveways, side streets or utilities of <br />any kind. <br /> <br />During this phase, crews will be required to work a minimum of 12 hours per day, though we may arrange for longer <br />schedules if the work is warranted. This phase of the operation is typically completed within 72 working hours (3 to 7 <br />ten hour days) after a declared disaster event. Depending on the magnitude of the disaster, however, full clearance <br />could take up to four weeks. Regardless, we will make a concerted effort to complete this task in the most expeditious <br />manner, ensuring that the City maximizes its reimbursement for this phase of work. <br /> <br />Lastly, we will report daily to the City all sub-contractors, certified equipment numbers, volumes of trucks and <br />equipment in use, as well as the number of working personnel. These reports will include daily and cumulative hourly <br />statistics on the number of hours worked clearing debris. The cumulative and daily statistic totals for each equipment <br />type will be reported separately. We will ensure all reporting submitted to the City representative is audit quality. <br /> <br />. Debris Loading General Protocols <br />To safely and efficiently remove and collect eligible storm generated debris from public property and public rights-of- <br />way, AshBritt employs the following protocols and processes for efficient recovery operations: <br /> <br />Collection Equipment <br />Trucks and trailers used for debris collection will be inspected for safety prior to being certified. Repair of any safety <br />deficiencies are required prior to certification and assignment. Trucks and trailers are required to have tailgates that <br />secure the load and prevent debris from falling from the vehicle during transport (please see attached illustration). <br /> <br />Truck Measurements and Signage <br />Truck certifications/measurements will be conducted by City representatives (or contracted monitoring agent) at a <br />location approved by the City OM. Measurements of the height, width, and length of the truck or trailer bed are taken <br />and recorded. Sideboards or other extensions to the bed are allowable provided they meet all applicable rules and <br />regulations, cover the front and both sides, and are constructed in a manner to withstand severe operating conditions. <br />The sideboards will be constructed of 2" by 6" boards or greater and will not extend more than two feet above the metal <br />bedsides and are subject to approval by the City OM. Metal sideboards may also be accepted. All sideboards are subject <br />to approval by the City OM. <br /> <br />If a truck either adds or subtracts sideboards the vehicle must be re-measured and a new truck number issued. The old <br />truck number will be permanently retired. Once trucks are rated by the City OM, the project QC/Compliance Manager <br />will be responsible to report any adjustments of the sideboards to City representatives. Extensions are subject to <br /> <br />AshBritt, Inc. I Sunny Isles Beach. FL I RFP No. 08-07-01 <br /> <br />51 <br />